Put new sweeper nozzle on Johnson sweeper, Also washed and waxed sweeper and<br />

John Deere mowing tractor.<br />

2-8-2013 Sanded Main roads, Schools and parking lots, <strong>Town</strong> sanders 12 hours, 2<br />

contract sanders 4 hours.<br />

2-8-2013 Called 14 private contractors for snow plowing at 8:00 PM, 271.5 hours snow<br />

plowing by private contractors. 3 Park Dept vehicles 68.5 hours plowing, 2 WPCF<br />

vehicles 43 hours plowing, 8 Highway Dept vehicles, 5 dump trucks 120 hours plowing<br />

and 3 one ton dump trucks 102 hours snow plowing, Sidewalk plow 32 hours plowing<br />

sidewalks and two persons from the Building Dept clearing the sidewalks at the<br />

Annex 12 hours clearing sidewalks.<br />

John Deere front end loader moved 27 trees out <strong>of</strong> roadway around town so roads<br />

could be plowed. Trees will be cut and picked up after storm. 1 man 26 hours.<br />

2-9-2013 Sanded after plowing Main, secondary, Schools, parking lots and dirt roads. 4<br />

town sanders 24 hours. 2 contract sanders 8 hours.<br />

Checked out and greased all trucks, sanders, sidewalk plow and loader. 2 men 16 hours<br />

Put ice melt and salt and sand were needed on sidewalks. 2 men 42 hours<br />

Cut up downed trees and chipped up limbs with wood chipper and picked up remaining<br />

wood and took to TW Nickerson 5 men 300 hours.<br />

2-12-2013 Sanded main roads, Schools, parking lots and touch up secondary roads.<br />

<strong>Town</strong> sanders 12 hours, private contractors 4 hours.<br />

Plowed airport runway 1 man 2.5 hours.<br />

2-13-2013 Spot sanding roads, 1 town sander 1.5 hours.<br />

Made repairs to TW Nickerson snow plow. 1 man 3 hours<br />

Made repairs to snowblower for Bobcat skidsteer loader 1 man 5 hours.<br />

2-14-2013 Sanded Main, secondary roads, Schools and parking lots. 4 town sanders 17.5<br />

hours, 2 private contractor sanders 7 hours.<br />

2-17-2013 Sanded Main, secondary roads and parking lots. <strong>Town</strong> sanders 21 hours, 2<br />

private contractor sanders 7 hours.<br />

2-17-2013 Called 13 private contractors for snow plowing at 10 AM. 109 hours plowing,<br />

3 Park Dept one ton dump trucks 28 hours plowing, WPCF 1 pickup truck and 1 one ton<br />

work truck 24 hours plowing, Highway Dept 6 wheel dump trucks 60 hours plowing,<br />

3one ton dump trucks 36 hours plowing, Sidewalk plow 23 hours, 2 employee’s from<br />

Building Dept clearing sidewalks at Annex 12 hours.<br />

2-17-2013 Sanded Main and secondary roads, Schools, parking lots after plowing, 4<br />

town sanders 17.5 hours sanding, 2 private contractor sanders 7 hours sanding.<br />

2 men maining sidewalks on Main Street and keeping crosswalks open to foot traffic<br />

along with keeping Main Street cleaned. 82 hours.<br />

Cleaned out all sanders and greased conveyor chains and rollers, Cleaned and checked<br />

out all trucks oil,water, lights,etc.<br />

2 men checking and patching pot holes, 80 hours ( lot <strong>of</strong> patching will be needed in the<br />

future)<br />

Continued cleanup from storm chipping brush and downed tree limbs, also removed<br />

tree stumps and took same to TW Nickerson 6 loads.3 men 32 hours.<br />

Checked and cleaned <strong>of</strong>f all catch basin grates and drainage run<strong>of</strong>fs 4 men 128 hours.<br />