Put new sweeper nozzle on Johnson sweeper, Also washed and waxed sweeper and<br />
John Deere mowing tractor.<br />
2-8-2013 Sanded Main roads, Schools and parking lots, <strong>Town</strong> sanders 12 hours, 2<br />
contract sanders 4 hours.<br />
2-8-2013 Called 14 private contractors for snow plowing at 8:00 PM, 271.5 hours snow<br />
plowing by private contractors. 3 Park Dept vehicles 68.5 hours plowing, 2 WPCF<br />
vehicles 43 hours plowing, 8 Highway Dept vehicles, 5 dump trucks 120 hours plowing<br />
and 3 one ton dump trucks 102 hours snow plowing, Sidewalk plow 32 hours plowing<br />
sidewalks and two persons from the Building Dept clearing the sidewalks at the<br />
Annex 12 hours clearing sidewalks.<br />
John Deere front end loader moved 27 trees out <strong>of</strong> roadway around town so roads<br />
could be plowed. Trees will be cut and picked up after storm. 1 man 26 hours.<br />
2-9-2013 Sanded after plowing Main, secondary, Schools, parking lots and dirt roads. 4<br />
town sanders 24 hours. 2 contract sanders 8 hours.<br />
Checked out and greased all trucks, sanders, sidewalk plow and loader. 2 men 16 hours<br />
Put ice melt and salt and sand were needed on sidewalks. 2 men 42 hours<br />
Cut up downed trees and chipped up limbs with wood chipper and picked up remaining<br />
wood and took to TW Nickerson 5 men 300 hours.<br />
2-12-2013 Sanded main roads, Schools, parking lots and touch up secondary roads.<br />
<strong>Town</strong> sanders 12 hours, private contractors 4 hours.<br />
Plowed airport runway 1 man 2.5 hours.<br />
2-13-2013 Spot sanding roads, 1 town sander 1.5 hours.<br />
Made repairs to TW Nickerson snow plow. 1 man 3 hours<br />
Made repairs to snowblower for Bobcat skidsteer loader 1 man 5 hours.<br />
2-14-2013 Sanded Main, secondary roads, Schools and parking lots. 4 town sanders 17.5<br />
hours, 2 private contractor sanders 7 hours.<br />
2-17-2013 Sanded Main, secondary roads and parking lots. <strong>Town</strong> sanders 21 hours, 2<br />
private contractor sanders 7 hours.<br />
2-17-2013 Called 13 private contractors for snow plowing at 10 AM. 109 hours plowing,<br />
3 Park Dept one ton dump trucks 28 hours plowing, WPCF 1 pickup truck and 1 one ton<br />
work truck 24 hours plowing, Highway Dept 6 wheel dump trucks 60 hours plowing,<br />
3one ton dump trucks 36 hours plowing, Sidewalk plow 23 hours, 2 employee’s from<br />
Building Dept clearing sidewalks at Annex 12 hours.<br />
2-17-2013 Sanded Main and secondary roads, Schools, parking lots after plowing, 4<br />
town sanders 17.5 hours sanding, 2 private contractor sanders 7 hours sanding.<br />
2 men maining sidewalks on Main Street and keeping crosswalks open to foot traffic<br />
along with keeping Main Street cleaned. 82 hours.<br />
Cleaned out all sanders and greased conveyor chains and rollers, Cleaned and checked<br />
out all trucks oil,water, lights,etc.<br />
2 men checking and patching pot holes, 80 hours ( lot <strong>of</strong> patching will be needed in the<br />
future)<br />
Continued cleanup from storm chipping brush and downed tree limbs, also removed<br />
tree stumps and took same to TW Nickerson 6 loads.3 men 32 hours.<br />
Checked and cleaned <strong>of</strong>f all catch basin grates and drainage run<strong>of</strong>fs 4 men 128 hours.<br />
Department Head Monthly Report to the <strong>Town</strong> Manager – February 2013 Page 30