Commission on a regional approach to the future solid waste disposal options after the current<br />

SEMASS contract expires at the end <strong>of</strong> 2014.<br />

DPW Division Operations<br />

Attached are the reports from the Department <strong>of</strong> Public Works divisions consisting <strong>of</strong> the<br />

Water, Sewer, Solid Waste Transfer Station, and Highway Divisions.<br />

Listed below is an overview <strong>of</strong> the daily and monthly activities for February, 2013.<br />

January Water Pumpage:<br />

Monthly Maximum<br />

Total Day<br />

Minimum<br />

Day<br />

Average<br />

Day<br />

Estimated<br />

Other Use<br />

Previous<br />

Month<br />

14,800,600<br />

Gallons<br />

919,100<br />

Gallons<br />

331,200<br />

Gallons<br />

528,592<br />

Gallons<br />

744,732<br />

Gallons<br />

16,076,500<br />

Gallons<br />

The variance between February 2013 and February 2012’s pumpage shows a decrease <strong>of</strong> 4.7%,<br />

which equates to 734,600 gallons. Please note that 2012 was a leap year and February had 29<br />

days.<br />

Process<br />

Control<br />

328,746<br />

Gallons<br />

Flushing<br />

and<br />

Blow<strong>of</strong>fs<br />

259,300<br />

Gallons<br />

WWTP<br />

Usage<br />

0<br />

Gallons<br />

Total other uses 652,546 gallons.<br />

Municipal<br />

Usage<br />

24,875<br />

Gallons<br />

<strong>Chatham</strong><br />

Fire<br />

Dept.<br />

34,625<br />

Gallons<br />

New<br />

Mains<br />

0<br />

Gallons<br />

For more specific breakdown <strong>of</strong> other water use, please see Pumpage Report.<br />

Fire Flow<br />

Tests<br />

0<br />

Gallons<br />

Water Sampling<br />

10 bacteria samples were taken for the month <strong>of</strong> February. All were free <strong>of</strong> bacteria.<br />

Station Maintenance<br />

Routine and annual maintenance and housekeeping was performed at all stations.<br />

Static and dynamic (drawdowns) water level readings were recorded for each well.<br />

All standby engines were run and recorded.<br />

Woodard and Curran repaired the SCADA computer upstairs at the DPW building.<br />

Utility Services installed a data logger at the 1.35 MG storage tank to determine the<br />

cause <strong>of</strong> the PAX mixer faulting.<br />

System Maintenance<br />

Leak detection is on-going.<br />

Dubis replaced the main to curb service for 159 Seaview Street.<br />

Compliance<br />

Department Head Monthly Report to the <strong>Town</strong> Manager – February 2013 Page 25