Commission on a regional approach to the future solid waste disposal options after the current<br />
SEMASS contract expires at the end <strong>of</strong> 2014.<br />
DPW Division Operations<br />
Attached are the reports from the Department <strong>of</strong> Public Works divisions consisting <strong>of</strong> the<br />
Water, Sewer, Solid Waste Transfer Station, and Highway Divisions.<br />
Listed below is an overview <strong>of</strong> the daily and monthly activities for February, 2013.<br />
January Water Pumpage:<br />
Monthly Maximum<br />
Total Day<br />
Minimum<br />
Day<br />
Average<br />
Day<br />
Estimated<br />
Other Use<br />
Previous<br />
Month<br />
14,800,600<br />
Gallons<br />
919,100<br />
Gallons<br />
331,200<br />
Gallons<br />
528,592<br />
Gallons<br />
744,732<br />
Gallons<br />
16,076,500<br />
Gallons<br />
The variance between February 2013 and February 2012’s pumpage shows a decrease <strong>of</strong> 4.7%,<br />
which equates to 734,600 gallons. Please note that 2012 was a leap year and February had 29<br />
days.<br />
Process<br />
Control<br />
328,746<br />
Gallons<br />
Flushing<br />
and<br />
Blow<strong>of</strong>fs<br />
259,300<br />
Gallons<br />
WWTP<br />
Usage<br />
0<br />
Gallons<br />
Total other uses 652,546 gallons.<br />
Municipal<br />
Usage<br />
24,875<br />
Gallons<br />
<strong>Chatham</strong><br />
Fire<br />
Dept.<br />
34,625<br />
Gallons<br />
New<br />
Mains<br />
0<br />
Gallons<br />
For more specific breakdown <strong>of</strong> other water use, please see Pumpage Report.<br />
Fire Flow<br />
Tests<br />
0<br />
Gallons<br />
Water Sampling<br />
10 bacteria samples were taken for the month <strong>of</strong> February. All were free <strong>of</strong> bacteria.<br />
Station Maintenance<br />
Routine and annual maintenance and housekeeping was performed at all stations.<br />
Static and dynamic (drawdowns) water level readings were recorded for each well.<br />
All standby engines were run and recorded.<br />
Woodard and Curran repaired the SCADA computer upstairs at the DPW building.<br />
Utility Services installed a data logger at the 1.35 MG storage tank to determine the<br />
cause <strong>of</strong> the PAX mixer faulting.<br />
System Maintenance<br />
Leak detection is on-going.<br />
Dubis replaced the main to curb service for 159 Seaview Street.<br />
Compliance<br />