Lime Hill Road Pumping Station<br />
Daily inspections and checks <strong>of</strong> the station were performed.<br />
Daily, weekly and monthly O&M requirements were met and completed utilizing<br />
computerized maintenance program work orders.<br />
Meadowview Road Pumping Station<br />
Daily inspections and checks <strong>of</strong> the station were performed.<br />
Daily, weekly and monthly O&M requirements were met and completed utilizing<br />
computerized maintenance program work orders.<br />
We continue to experience issues with pump # 1 failing to run in automatic. We are<br />
working with representatives <strong>of</strong> GHD, Hayes Pump/Gorman Rupp and MECO to resolve<br />
the issue.<br />
Horeseshoe Lane Pumping Station<br />
Daily inspections and checks <strong>of</strong> the station were performed.<br />
Daily, weekly and monthly O&M requirements were met and completed utilizing<br />
computerized maintenance program work orders.<br />
Barn Hill Road Pumping Station<br />
Daily inspections and checks <strong>of</strong> the station were performed.<br />
Daily, weekly and monthly O&M requirements were met and completed utilizing<br />
computerized maintenance program work orders.<br />
National Grid responded to a possible natural gas leak at the pumping station. Upon<br />
arrival, they determined that it was not a leak. The cause <strong>of</strong> the odor appears to be with<br />
the station’s odor control unit. GHD, Meco and the unit’s manufacturer have been<br />
notified <strong>of</strong> the problem and are currently working to identify and resolve the issue.<br />
Collection Station and Forcemain<br />
Grease trap inspections for the month <strong>of</strong> February were performed and completed.<br />
Dig safe mark outs are up to date.<br />
As a precaution, we jet washed the Kate Gould Park sewer line.<br />
J.W. Dubis Co. temporarily repaired (plated and buried) a manhole located in the<br />
intersection <strong>of</strong> Old Harbor and Depot Roads that was damaged by a snow plow. Final<br />
repair will occur this spring.<br />
CHATHAM WATER POLLUTION CONTROL FACILITY<br />
MONTHLY REPORT<br />
February 2013<br />
INFLUENT<br />
Department Head Monthly Report to the <strong>Town</strong> Manager – February 2013 Page 28