23.02.2016 Views

STREETSCAPE GUIDANCE

streetscape-guidance

streetscape-guidance

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HOME<br />

INTRODUCTION<br />

PART A<br />

A vision for London’s streets<br />

PART B<br />

From strategy to delivery<br />

PART C<br />

New measures for new challenges<br />

PART D<br />

Balancing priorities<br />

PART F<br />

Appendix<br />

PART E<br />

Physical design and materials<br />

SECTION 6<br />

Introduction<br />

SECTION 7<br />

High quality footways<br />

SECTION 8<br />

Carriageways<br />

SECTION 9<br />

Crossings<br />

SECTION 10<br />

Kerbside activity<br />

SECTION 11<br />

Footway amenities<br />

SECTION 12<br />

Safety and functionality<br />

SECTION 13<br />

Street environment<br />

SECTION 14<br />

Transport interchanges<br />

Streetscape Guidance<br />

Contents<br />

PART E<br />

Physical design and materials<br />

6 Introduction<br />

7 High quality footways<br />

7.1 Vision ............................................... 67<br />

7.2 Footway materials............................. 67<br />

7.3 Interfaces and transitions.................. 80<br />

7.4 Footway crossovers........................... 83<br />

7.5 Inspection covers.............................. 85<br />

7.6 Smoke vents ..................................... 93<br />

7.7 Kerbs ................................................ 94<br />

8 Carriageways<br />

8.1 Vision ............................................. 103<br />

8.2 Carriageway materials...................... 103<br />

8.3 Road markings ................................. 109<br />

8.4 Cycle infrastructure......................... 113<br />

8.5 Bus lanes ......................................... 121<br />

8.6 Median strips/central reservations... 123<br />

9 Crossings<br />

9.1 Introduction.................................... 129<br />

9.2 Tactile paving .................................. 129<br />

9.3 Controlled crossings........................ 141<br />

9.4 Uncontrolled crossings.................... 154<br />

9.5 Traffic signals and controller cabinets..164<br />

9.6 Grade-separated pedestrian<br />

crossings ......................................... 167<br />

9.7 Subways.......................................... 169<br />

9.8 Pedestrian and cycle bridges............ 171<br />

9.9 Road bridges.................................... 172<br />

9.10 Road underpasses and bridges over<br />

roads .............................................. 174<br />

10 Kerbside activity<br />

10.1 Vision ............................................. 177<br />

10.2 Parking and loading bays.................. 177<br />

10.3 Motorcycle parking.......................... 185<br />

10.4 Parking control equipment............... 187<br />

10.5 Electric vehicle charging points......... 188<br />

10.6 Bus stop environments.................... 188<br />

10.7 Coach facilities................................ 198<br />

11 Footway amenities<br />

11.1 Vision ............................................. 201<br />

11.2 Footway zones................................ 203<br />

11.3 Working with businesses.................. 211<br />

11.4 Colour of street furniture................. 216<br />

11.5 Cycle parking ................................... 217<br />

11.6 Cycle hire docking stations.............. 222<br />

11.7 Seats .............................................. 228<br />

11.8 Art ................................................. 232<br />

11.9 Bins ................................................. 233<br />

11.10 Letter and pouch boxes................... 238<br />

11.11 Telephone boxes.............................. 239<br />

11.12 Pedestrian wayfinding...................... 243<br />

12 Safety and functionality<br />

12.1 Traffic signs..................................... 247<br />

12.2 Bollards and low level traffic signs... 251<br />

12.3 Street name plates........................... 256<br />

12.4 Barrier free footways....................... 258<br />

12.5 Barriers ........................................... 259<br />

+<br />

12.6 Utility cabinets................................ 260<br />

12.7 Feeder pillars................................... 261<br />

12.8 Variable message signs.................... 263<br />

12.9 Environmental monitoring equipment.266<br />

12.10 Roadside cameras and CCTV........... 267<br />

12.11 Planned events infrastructure.......... 271<br />

13 Street environment<br />

13.1 Street environment.......................... 273<br />

13.2 Growing a greener London............... 273<br />

13.3 Keeping London dry......................... 283<br />

13.4 Lighting the way............................... 293<br />

13.5 Leftover spaces................................ 303<br />

13.6 Pocket parks.................................... 307<br />

14 Transport interchanges<br />

14.1 Vision ............................................. 312<br />

14.2 Street interchanges.......................... 312<br />

14.3 Transport mode specific design<br />

considerations ............................... 315<br />

14.4 Rail interchanges.............................. 316<br />

14.5 On-highway bus station interchanges.317<br />

14.6 Tram interchanges........................... 318<br />

14.7 London River Services interchanges. 320<br />

14.8 Taxi ranks......................................... 321<br />

14.9 Cycle parking hubs........................... 323<br />

PART F<br />

Appendix<br />

15.1 List of references............................. 326<br />

15.2 List of revisions ............................... 331

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!