08.12.2012 Views

1 2 3 4 5

1 2 3 4 5

1 2 3 4 5

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1<br />

12<br />

3<br />

4<br />

5<br />

1-11 Installation Instructions<br />

Selecting the Installation Site<br />

■ Air Discharge Chamber for Top Discharge<br />

Be sure to install the air discharge chamber in the filed<br />

when:<br />

● it is difficult to keep a space of min. 50 cm between<br />

the air discharge outlet and the obstacle.<br />

● the air discharge outlet is facing to the sidewalk and<br />

discharged hot air annoys the passers.<br />

Refer to Fig. 1-6.<br />

■ Installing the Unit in Heavy Snow Areas<br />

In positions with strong wind, snow-proof ducting<br />

should likewise be fitted and direct exposure to the<br />

wind should be avoided as much as possible.<br />

Countermeasures against snow and wind in regions<br />

with snow and strong wind, the following problems<br />

may occur when the outdoor unit is not provided with a<br />

platform and snow-proof ducting.<br />

a) The outdoor fan may not run and damage of the<br />

unit may be caused.<br />

b) There may be no air flow.<br />

c) The tubing may freeze and burst.<br />

d) The condenser pressure may drop because of<br />

strong wind, and the indoor unit may freeze.<br />

■ Precautions for Installation in Heavy Snow<br />

Areas<br />

(1) The platform should be higher than the max.<br />

snow depth. (Fig. 1-7)<br />

(2) The two fixing feet of the outdoor unit should be<br />

used for the platform, and the platform should be<br />

installed beneath the air intake side of outdoor<br />

unit.<br />

(3) The platform foundation must be firmer and the<br />

unit must be secured with anchor bolts.<br />

(4) In case of installation on a roof subject to strong<br />

wind, countermeasures must be taken to prevent<br />

the unit from being blown over.<br />

■ Dimensions of Snow / Wind-proof Ducting and<br />

Refrigerant Tubing Space for Installation<br />

Duct<br />

Duct<br />

Outdoor Unit<br />

Min. 100<br />

300<br />

Min. 100 300 Unit: mm 0489_C_I<br />

I - 102<br />

Air<br />

Intake<br />

Duct<br />

Without snowproof<br />

ducting<br />

(Low platform)<br />

Outdoor<br />

Unit<br />

About 1/2 of the<br />

unit height<br />

Fig. 1-9<br />

1. Specifications<br />

Air discharge<br />

Duct<br />

0426_C_I<br />

Fig. 1-6<br />

In regions with snow fall, the outdoor unit should be<br />

provided with a platform and snow-proof duct.<br />

Without snowproof<br />

ducting<br />

(High platform)<br />

0487_C_I<br />

Fig. 1-7 Fig. 1-8<br />

Air<br />

Intake<br />

Platform (foundation)<br />

Example of Installation<br />

Higher than the<br />

maximum<br />

snow depth<br />

0490_C_I<br />

0488_C_I

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!