Neftegaz.RU #3-17 ENG
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
EVENTS<br />
Oil prices<br />
Duty abolition<br />
Increase in production capacity<br />
The new head of “Rosneft”<br />
Nord Stream<br />
Presidential elections<br />
Gas wars<br />
Launch of new production<br />
Stock market crash<br />
The productivity of the<br />
Bazhenov formation will be<br />
considered in KhMAD<br />
RussNeft launched a pilot project<br />
for the construction of wells at<br />
Sredne-Shapshinskoye oilfield,<br />
which the company will explore the<br />
Bazhenov shale.<br />
In 20<strong>17</strong>, the company intends to<br />
drill on the field 16 new wells in<br />
3 well clusters. The productivity<br />
of sediments is directly related<br />
to abnormally high formation<br />
pressure (AHRP), which is caused<br />
by the lack of primary migration<br />
of hydrocarbons in traditional<br />
reservoirs. The presence of<br />
abnormally high pressure zones<br />
improves the properties of the<br />
reservoir, this increase the time<br />
of natural exploitation without the<br />
use of secondary methods. But,<br />
at the same time increases the<br />
threat of complications during<br />
the drilling. For prediction of pore<br />
pressure prediction using various<br />
types of well logging, seismic,<br />
drilling data. Given the presence<br />
of a zone of abnormally high<br />
pressure that is unique to the<br />
Bazhenov deposits, drilling in the<br />
Medium-Shapshinskoye oilfield<br />
use innovative service prediction<br />
of pore pressure prediction.<br />
The new service is based on an<br />
integrated approach: the hardware<br />
is built on the basis of engineering<br />
calculations that helps to minimize<br />
risks during the drilling. Resources<br />
of the Bazhenov formation in<br />
Sredne-Shapshinsky field contain<br />
more than 40 million tons.<br />
Oil from coral reefs<br />
In the framework of the<br />
implementation of the Technology<br />
strategy Gazprom Neft has<br />
developed a program of<br />
introduction of new technologies<br />
for extraction of oil from carbonate<br />
and fractured reservoirs. These<br />
include more than 40% of<br />
recoverable reserves (about 600<br />
million tons of hydrocarbons). At<br />
the fields of Gazprom Neft about<br />
40% of the remaining reserves are<br />
contained in carbonate reservoirs.<br />
The largest assets with such<br />
deposits are the Eastern section<br />
of the Orenburg oil and gas<br />
condensate field, and Chonskoy at<br />
Kuyumbinskoe field in East Siberia,<br />
the project of Badra in Iraq, the<br />
Prirazlomnaye field in the Pechora<br />
sea.<br />
A new program developed by the<br />
Scientific and technical center of<br />
Gazprom Neft and includes 12<br />
technological projects in the field<br />
of exploration, mining, drilling and<br />
production of oil.<br />
In particular, Chonskoy project will<br />
apply technology for intensification<br />
of oil production from a carbonate<br />
reservoir, the pores of which are<br />
partially filled with salt and do<br />
not leak oil. On at Kuyumbinskoe<br />
field is the choice of technology to<br />
acid fracturing and on the Eastern<br />
section of the Orenburg field of<br />
technological solutions aimed at<br />
the search of optimum modes of<br />
operation of the wells.<br />
Reactivate plugged and<br />
abandoned wells<br />
RN-Sakhalinmorneftegaz has<br />
successfully completed the<br />
construction of the energy complex<br />
Katangli on the same field and<br />
started commissioning works.<br />
As reported on March 1, 20<strong>17</strong><br />
by Rosneft, modular and energy<br />
complex became the 1st of the<br />
largest in the Sakhalin region.<br />
The total capacity of 12 MW 6<br />
gas turbine units provide, capable<br />
of operating in PNG. In addition,<br />
5 of the boiler can produce 125<br />
t/h process steam. In all, the<br />
complex of over 20 buildings and<br />
structures: transformer station 6/35<br />
kV, the area of power generation,<br />
automatic gas distribution station,<br />
boiler, etc.<br />
With the launch of the energy<br />
complex of the Katangli field is<br />
expected to resume production<br />
at the mothballed wells that will<br />
provide growth in daily production<br />
by more than 30%.<br />
12 ~ <strong>Neftegaz</strong>.<strong>RU</strong> [3]