OFS<br />
РИС. 1. Темпы падения по дебиту жидкости ГС с МГРП на 1 кусте<br />
No.12Г) have been brought into<br />
development in 2011 and two wells<br />
(No.13Г and No.14Г) – in 2012.<br />
As on January 01, 2013, all four<br />
horizontal wells are drilled to the bed<br />
АС11 with various lengths (Figure 1).<br />
As on January 01, 2013, additional<br />
oil production from HW with multistage<br />
fracturing has amounted 202.7<br />
ths.t, cumulative fluid production has<br />
amounted 228 ths.t.<br />
The best indicators are obtained<br />
at the wells 12Г and 13Г, which is<br />
related first of all to increase of net<br />
oil pay thicknesses. The well 11Г<br />
has the lowest decline rates, flow<br />
rates decline is related to emergency<br />
condition of the well. One can<br />
observe stabilization of the decline<br />
rate by fluid. The average decline<br />
rate amounts 0.6.<br />
During the years 2011 – 2012, four<br />
directionally-inclined producing<br />
wells, namely, 15, 16, <strong>17</strong> and<br />
18, have been commissioned<br />
at the experimental plot. These<br />
wells performance indicators are<br />
significantly inferior to horizontal<br />
wells with hydraulic fracturing.<br />
The table 1 gives comparison or<br />
operation of horizontal wells and<br />
directionally-inclined wells located at<br />
the experimental plot.<br />
As one can see in the Figure 2,<br />
current flow rate of HW exceeds<br />
experimental plot vertical wells flow<br />
rates by 2.5 – 3.0 times.<br />
The average cumulative withdrawal<br />
per one directionally-inclined well<br />
amounts 10.7 ths. t, when the<br />
average cumulative production at<br />
horizontal wells amounts 50.6 ths. t<br />
(from 22.7 to 89.2 ths. t). Additional<br />
oil production during the period<br />
2011 – 2012 has amounted 202.7<br />
ths. t.<br />
High costs of construction of<br />
horizontal wells with multi-stage<br />
hydraulic fracturing dictate necessity<br />
for sound approach of the designing<br />
stage implementation. Calculations<br />
of the alternative variants for the<br />
experimental plot development by<br />
various parameters, namely wells<br />
location, fractures orientation, have<br />
been performed at the Priobskoe<br />
field. The data have been compared<br />
with the basic approved variant –<br />
TABLE 1. The main technological performance indicators of HW and DIW<br />
Параметры работы<br />
Horizontal wells with multistage<br />
hydraulic fracturing<br />
Initial<br />
parameters<br />
As on January<br />
01, 2013<br />
Directionally-inclined wells<br />
with hydraulic fracturing<br />
Initial<br />
parameters<br />
As on January<br />
01, 2013<br />
Oil flow rate, t/day 210.5 131.8 93.2 15.5<br />
Fluid flow rate, t/day 255.3 161.5 99.3 34.3<br />
Water cut, % 5.3 18.0 6.3 33.5<br />
Cumulative oil<br />
production, ths. t<br />
202.4 42.7<br />
Cumulative fluid<br />
production, ths. t<br />
228.0 70.4<br />
FIG. 2. Comparison of oil flow rates of HS with DIW in the cluster 1<br />
[3] <strong>Neftegaz</strong>.<strong>RU</strong> ~ 25