OFS<br />

РИС. 1. Темпы падения по дебиту жидкости ГС с МГРП на 1 кусте<br />

No.12Г) have been brought into<br />

development in 2011 and two wells<br />

(No.13Г and No.14Г) – in 2012.<br />

As on January 01, 2013, all four<br />

horizontal wells are drilled to the bed<br />

АС11 with various lengths (Figure 1).<br />

As on January 01, 2013, additional<br />

oil production from HW with multistage<br />

fracturing has amounted 202.7<br />

ths.t, cumulative fluid production has<br />

amounted 228 ths.t.<br />

The best indicators are obtained<br />

at the wells 12Г and 13Г, which is<br />

related first of all to increase of net<br />

oil pay thicknesses. The well 11Г<br />

has the lowest decline rates, flow<br />

rates decline is related to emergency<br />

condition of the well. One can<br />

observe stabilization of the decline<br />

rate by fluid. The average decline<br />

rate amounts 0.6.<br />

During the years 2011 – 2012, four<br />

directionally-inclined producing<br />

wells, namely, 15, 16, <strong>17</strong> and<br />

18, have been commissioned<br />

at the experimental plot. These<br />

wells performance indicators are<br />

significantly inferior to horizontal<br />

wells with hydraulic fracturing.<br />

The table 1 gives comparison or<br />

operation of horizontal wells and<br />

directionally-inclined wells located at<br />

the experimental plot.<br />

As one can see in the Figure 2,<br />

current flow rate of HW exceeds<br />

experimental plot vertical wells flow<br />

rates by 2.5 – 3.0 times.<br />

The average cumulative withdrawal<br />

per one directionally-inclined well<br />

amounts 10.7 ths. t, when the<br />

average cumulative production at<br />

horizontal wells amounts 50.6 ths. t<br />

(from 22.7 to 89.2 ths. t). Additional<br />

oil production during the period<br />

2011 – 2012 has amounted 202.7<br />

ths. t.<br />

High costs of construction of<br />

horizontal wells with multi-stage<br />

hydraulic fracturing dictate necessity<br />

for sound approach of the designing<br />

stage implementation. Calculations<br />

of the alternative variants for the<br />

experimental plot development by<br />

various parameters, namely wells<br />

location, fractures orientation, have<br />

been performed at the Priobskoe<br />

field. The data have been compared<br />

with the basic approved variant –<br />

TABLE 1. The main technological performance indicators of HW and DIW<br />

Параметры работы<br />

Horizontal wells with multistage<br />

hydraulic fracturing<br />

Initial<br />

parameters<br />

As on January<br />

01, 2013<br />

Directionally-inclined wells<br />

with hydraulic fracturing<br />

Initial<br />

parameters<br />

As on January<br />

01, 2013<br />

Oil flow rate, t/day 210.5 131.8 93.2 15.5<br />

Fluid flow rate, t/day 255.3 161.5 99.3 34.3<br />

Water cut, % 5.3 18.0 6.3 33.5<br />

Cumulative oil<br />

production, ths. t<br />

202.4 42.7<br />

Cumulative fluid<br />

production, ths. t<br />

228.0 70.4<br />

FIG. 2. Comparison of oil flow rates of HS with DIW in the cluster 1<br />

[3] <strong>Neftegaz</strong>.<strong>RU</strong> ~ 25