distribution substation in order to define purchase amount, and to prevent<br />

reverse power from the distribution system into the transmission system<br />

which would cause power losses. Therefore, to prevent such a problem,<br />

power generation from renewable energy sources must be managed by the<br />

distribution operators - Metropolitan Electricity Authority (MEA) and Provincial<br />

Electricity Authority (PEA) -<br />

In the future, the renewable purchase schemes would play a vital role in<br />

implementing the AEDP, thus, the Energy Regulatory Commission (ERC) will be responsible<br />

for monitoring the country’s renewable energy status, and revising the AEDP by situation. As<br />

a result, private investors would have a clear picture of the country’s renewable energy<br />

development.<br />

3.3 Principles and Directions for Firmed Cogeneration SPPs with PPAs<br />

expiration date during year 2017-2025<br />

The National Energy Policy Council (NEPC) approved principles and directions for<br />

firmed cogeneration SPPs with PPAs expiration date during year 2017-2025, the details are as<br />

follows:<br />

1. Criteria for Firmed Cogeneration SPPs with PPAs expiration date during<br />

year 2017-2025<br />

Cogeneration power plants could generate both electricity power and useful heat<br />

in the form of steam. Therefore, it is advantageous for industrial estates not to invest on<br />

unnecessary own boilers. Moreover, Replacement of expired Cogeneration SPPs and<br />

construction of the news are ease because of community acceptance and the existing<br />

infrastructure exploitation. Thus, the criteria for Firmed Cogeneration SPPs with PPAs<br />

expiration date during year 2017-2025 are as follows:<br />

1.1 In case of PPA renewal for old technology cogeneration SPPs, the tariff<br />

structure will be renegotiated because the investor has already recovered construction<br />

costs.<br />

1.2 In case of construction of new cogeneration SPPs, it is necessary to<br />

promote cogeneration SPPs as Distributed Generation (DG) in order to lessen losses in<br />

transmission and distribution system by the following measures:<br />

3-7