distribution substation in order to define purchase amount, and to prevent<br />
reverse power from the distribution system into the transmission system<br />
which would cause power losses. Therefore, to prevent such a problem,<br />
power generation from renewable energy sources must be managed by the<br />
distribution operators - Metropolitan Electricity Authority (MEA) and Provincial<br />
Electricity Authority (PEA) -<br />
In the future, the renewable purchase schemes would play a vital role in<br />
implementing the AEDP, thus, the Energy Regulatory Commission (ERC) will be responsible<br />
for monitoring the country’s renewable energy status, and revising the AEDP by situation. As<br />
a result, private investors would have a clear picture of the country’s renewable energy<br />
development.<br />
3.3 Principles and Directions for Firmed Cogeneration SPPs with PPAs<br />
expiration date during year 2017-2025<br />
The National Energy Policy Council (NEPC) approved principles and directions for<br />
firmed cogeneration SPPs with PPAs expiration date during year 2017-2025, the details are as<br />
follows:<br />
1. Criteria for Firmed Cogeneration SPPs with PPAs expiration date during<br />
year 2017-2025<br />
Cogeneration power plants could generate both electricity power and useful heat<br />
in the form of steam. Therefore, it is advantageous for industrial estates not to invest on<br />
unnecessary own boilers. Moreover, Replacement of expired Cogeneration SPPs and<br />
construction of the news are ease because of community acceptance and the existing<br />
infrastructure exploitation. Thus, the criteria for Firmed Cogeneration SPPs with PPAs<br />
expiration date during year 2017-2025 are as follows:<br />
1.1 In case of PPA renewal for old technology cogeneration SPPs, the tariff<br />
structure will be renegotiated because the investor has already recovered construction<br />
costs.<br />
1.2 In case of construction of new cogeneration SPPs, it is necessary to<br />
promote cogeneration SPPs as Distributed Generation (DG) in order to lessen losses in<br />
transmission and distribution system by the following measures:<br />