07.07.2017 Views

Thailand Power Development Plan 2015-2036

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 6.1 (continuous)<br />

Details of Transmission System Expansion Projects during <strong>2015</strong> – <strong>2036</strong><br />

PDP<strong>2015</strong><br />

Name of Project<br />

Future Projects<br />

1. Transmission System Improvement Project in Northeastern,<br />

Lower Northern, Central Regions and Bangkok Area to Enhance<br />

System Security<br />

2. Transmission System Improvement Project in Upper Northern<br />

Region to Enhance System Security<br />

3. Bulk <strong>Power</strong> Supply for the Greater Bangkok Area, Phase 4<br />

(BSB4)<br />

4. Bulk <strong>Power</strong> Supply for the Greater Bangkok Area, Phase 5<br />

(BSB5)<br />

5. Bulk <strong>Power</strong> Supply for the Greater Bangkok Area, Phase 6<br />

Commission<br />

Date (Year)<br />

2019 / 2021 /<br />

2023<br />

2019 / 2021<br />

2019 – 2025<br />

2026 – 2032<br />

2033 – 2039<br />

(BSB6)<br />

6. Transmission System Expansion Project No. 13 (TS.13) 2019 – 2025<br />

7. Transmission System Expansion Project No. 14 (TS.14) 2026 – 2032<br />

8. Transmission System Expansion Project No. 15 (TS.15) 2033 – 2039<br />

9. Transmission System Improvement Project in Southern Region<br />

to Enhance System Security, Phase 1<br />

10. Transmission System Improvement Project in Southern Region<br />

to Enhance System Security, Phase 2<br />

11. Submarine Cable <strong>Development</strong> Project in Koh Samui,<br />

Surat Thani Province, to Enhance System Security<br />

12. Transmission System Improvement Project in Upper Northern<br />

Region to Enhance System Security, Phase 2<br />

13. Transmission System Expansion and Renovation Project,<br />

Phase 3<br />

14. Transmission System Expansion and Renovation Project,<br />

Phase 4<br />

15. Transmission System <strong>Development</strong> Project for <strong>Power</strong> Purchase<br />

from IPPs, Phase 3 (IPP 2012)<br />

2022<br />

2027<br />

2019<br />

2024 – 2029<br />

2017 – 2021<br />

2022 – 2026<br />

2021 – 2026<br />

6-12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!