07.07.2017 Views

Thailand Power Development Plan 2015-2036

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 5.4<br />

<strong>Thailand</strong> <strong>Power</strong> <strong>Development</strong> <strong>Plan</strong> (<strong>2015</strong>-<strong>2036</strong>)<br />

Peak Fuel Contract Minimum<br />

Year Demand Projects<br />

Types Capacity Reserve Margin<br />

(MW) (MW) (%)<br />

2014 27,633 Total Contract Capacity as of December 2014 37,612 16.6%<br />

<strong>2015</strong> 29,051 VSPP 2,377 MW -<br />

SPP 988 MW -<br />

Gulf JP UT CC #1-2 (Jun, Dec) 2x800 MW Gas<br />

Kwae Noi Dam #1-2 2x15 MW Hydro<br />

Thap Sakae Solar Cell 5 MW Solar<br />

Khun Dan Prakarnchon Dam 10 MW Hydro<br />

Pasak Jolasid Dam 6.7 MW Hydro<br />

Mae Klong Dam #1-2 2x6 MW Hydro<br />

Lao PDR (Hong Sa) TH #1-2 (Jun, Nov) 2x491 MW Lignite 43,623 24.7<br />

2016 30,218 Retirement of Khanom TH #2 (Jun) -70.2 MW Gas/Oil<br />

Retirement of Khanom CC #1 (Jul) -678 MW Gas<br />

VSPP 271 MW -<br />

SPP 1,240 MW -<br />

North Bangkok CC #2 (Jan) 848.3 MW Gas<br />

Khanom Replacement CC #1 (Jul) 930 MW Gas<br />

National <strong>Power</strong> Supply TH #1-2 (Nov) 270 MW Coal<br />

Bang Lang Dam (Refurbish) 12 MW Hydro<br />

Sirindhorn Dam Solar Cell 0.3 MW Solar<br />

EGAT Solar Cell 10 MW Solar<br />

Lao PDR (Hong Sa) TH #3 (Mar) 491 MW Lignite 46,947 35.2<br />

2017 31,385 Retirement of Bang Pakong CC #3 (Jan) -314 MW Gas<br />

Retirement of SPP -180 MW -<br />

VSPP 283 MW -<br />

SPP 1,929 MW -<br />

National <strong>Power</strong> Supply TH #3-4 (Mar) 270 MW Coal<br />

Kiew Kormah Dam 5.5 MW Hydro<br />

Lam Ta Khong Wind Turbine Phase2 24.0 MW Wind 48,965 33.9<br />

2018 32,429 Retirement of Bang Pakong CC #4 (Jan) -314 MW Gas<br />

Retirement of Mae Moh TH #4-7 (Nov) -560 MW Lignite<br />

Retirement of SPP -42 MW -<br />

VSPP 288 MW -<br />

SPP 733 MW -<br />

Lam Ta Khong Pumped Storage #3-4 (Feb) 2x250 MW Hydro<br />

Replacement of Mae Moh TH #4-7 (Nov) 600 MW Lignite<br />

Klong Tron Dam 2.5 MW Hydro<br />

Chulabhorn Dam Hydropower 1.3 MW Hydro<br />

EGAT Biomass 4 MW Biomass<br />

EGAT Biogas 5 MW Energy Crop<br />

EGAT Solar Cell 10 MW Solar<br />

Mae Moh Solar Cell 1 MW Solar<br />

Krabi <strong>Power</strong> <strong>Plan</strong>t Solar Cell 2 MW Solar 50,196 33.8<br />

5-10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!