Thailand Power Development Plan 2015-2036
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table 5.4 (Continued)<br />
<strong>Thailand</strong> <strong>Power</strong> <strong>Development</strong> <strong>Plan</strong> (<strong>2015</strong>-<strong>2036</strong>)<br />
Peak Fuel Contract Minimum<br />
Year Demand Projects<br />
Types Capacity Reserve Margin<br />
(MW) (MW) (%)<br />
2027 41,693 Retirement of Bang Pakong CC #3 (Jan) -576 MW Gas/Heavy Oil<br />
Retirement of Ratchaburi CC #1-2 (Apr) -1,360 MW Gas<br />
Retirement of Ratchaburi CC #3 (Oct) -681 MW Gas<br />
Retirement of SPP -7 MW -<br />
VSPP 303 MW -<br />
Hua Na Hydropower 1 MW Hydro<br />
EGAT Wind Turbine 5 MW Wind<br />
<strong>Power</strong> Purchase from Neighbouring Countries 700 MW Hydro 60,645 24.6<br />
2028 42,681 Retirement of Bang Pakong TH #4 (Jan) -576 MW Gas/Heavy Oil<br />
Retirement of Glow IPP (Feb) -713 MW Gas<br />
Retirement of SPP -103 MW -<br />
VSPP 295 MW -<br />
Srinagarind Pumped Storage #1-3 3x267 MW Hydro<br />
Lam Dome Yai Hydropower 2 MW Hydro<br />
EGAT Biogas 5 MW Energy Crop<br />
Kamalasai Hydropower 1 MW Hydro<br />
EGAT Solar Cell 10 MW Solar<br />
Samutsakhon Wind Turbine 30 MW Wind<br />
<strong>Power</strong> Purchase from Neighbouring Countries 700 MW Hydro 61,097 20.5<br />
2029 43,489 Retirement of Lao PDR (Huay Ho) (Sep) -126 MW Hydro<br />
VSPP 313 MW -<br />
Huai Samong Dam 1 MW Hydro<br />
Kamphaeng Phet Substation Solar Cell 3 MW Solar<br />
EGAT Wind Turbine 5 MW Wind<br />
<strong>Power</strong> Purchase from Neighbouring Countries 700 MW Hydro 61,993 19.7<br />
2030 44,424 VSPP 313 MW -<br />
Mae Khan Dam 16 MW Hydro<br />
EGAT Biogas 5 MW Energy Crop<br />
EGAT Solar Cell 10 MW Solar<br />
<strong>Power</strong> Purchase from Neighbouring Countries 700 MW Hydro 63,037 18.4<br />
2031 45,438 Retirement of SPP -40 MW -<br />
VSPP 349 MW -<br />
Klong Luang Dam 1 MW Hydro<br />
EGAT Wind Turbine 5 MW Wind<br />
<strong>Power</strong> Purchase from Neighbouring Countries 700 MW Hydro 64,052 17.3<br />
2032 46,296 Retirement of BLCP TH #1 (Jan) -673 MW Coal<br />
Retirement of BLCP TH #2 (Feb) -673 MW Coal<br />
Retirement of GPG CC #1 (May) -734 MW Gas<br />
Retirement of SPP -9 MW -<br />
VSPP 356 MW -<br />
Replacement of Bang Pakong CC #3-4 1,300 MW Gas<br />
Mae Wong Dam 12 MW Hydro<br />
EGAT Biogas 5 MW Energy Crop<br />
EGAT Solar Cell 10 MW Solar<br />
<strong>Power</strong> Purchase from Neighbouring Countries 700 MW Hydro 64,345 15.0<br />
5-13