Koh Samui and its vicinity in the long run. Currently, PEA has operated one 33 kV and<br />

three 115 kV Submarine Cables of which the capacity will be able to cope with the<br />

growing electricity demand in the areas of Koh Samui, Koh Pha-Ngan, and Koh Tao for<br />

only 4-5 years. The project involves the construction of 230 kV submarine cable from<br />

EGAT’s substation to the new 230 kV Koh Samui substation (new EGAT substation). It is<br />

planned to be completed in 2019.<br />

6.2.7 Transmission System Improvement Project in Upper Northern<br />

Region to Enhance System Security, Phase 2<br />

The Transmission System Improvement Project in Upper Northern<br />

Region to Enhance System Security, Phase 2 is the successive project of Transmission<br />

System Improvement Project in Upper Northern Region to Enhance System Security. The<br />

project involves the construction of the 500 kV and 230 kV transmission system lines to<br />

increase the security of transmission system in Phayao and Chiang Rai Provinces to cope<br />

with the growing electricity demand in the long term and to accommodate ASEAN <strong>Power</strong><br />

Grid (APG) and power purchase from neighboring countries. It is planned to be completed<br />

during 2024 - 2029.<br />

6.3 Transmission System Expansion and Renovation Project<br />

6.3.1 Transmission System Expansion and Renovation Project, Phase 1:<br />

Substation<br />

The Transmission System Expansion and Renovation Project, Phase 1:<br />

Substation involves the improvement or replacement of aging equipment in substations<br />

which consist of 15 subprojects and miscellaneous system improvement. The project<br />

aims to increase the availability, reliability and security of the transmission system. It was<br />

approved by the cabinet on January 18, 2011 and planned to be completed in 2017.<br />

6.3.2 Transmission System Expansion and Renovation Project, Phase 1:<br />

Transmission Line<br />

The Transmission System Expansion and Renovation Project, Phase 1:<br />

Transmission Line involves the improvement or replacement of aging equipment in<br />

transmission line routes which consist of 15 subprojects and miscellaneous system<br />

improvement. The project aims to reduce the power outage caused by the aging<br />

transmission lines, to increase the continuity and efficiency in power supply and to<br />

enhance the reliability of the power system and the performance index of the<br />

transmission system. It was approved by the cabinet on May 20, 2012 and planned to be<br />

completed in 2019.<br />