07.07.2017 Views

Thailand Power Development Plan 2015-2036

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 5.4 (Continued)<br />

<strong>Thailand</strong> <strong>Power</strong> <strong>Development</strong> <strong>Plan</strong> (<strong>2015</strong>-<strong>2036</strong>)<br />

Peak Fuel Contract Minimum<br />

Year Demand Projects<br />

Types Capacity Reserve Margin<br />

(MW) (MW) (%)<br />

2033 47,025 Retirement of GPG CC #2 (Feb) -734 MW Gas<br />

Retirement of Ratchaburi <strong>Power</strong> CC #1 (Feb) -700 MW Gas<br />

Retirement of Ratchaburi <strong>Power</strong> CC #2 (May) -700 MW Gas<br />

VSPP 371 MW -<br />

Replacement of Bang Pakong TH #3-4 1,300 MW Gas<br />

Coal-Fired <strong>Power</strong> <strong>Plan</strong>t #4 1,000 MW Coal<br />

EGAT Wind Turbine 5 MW Wind<br />

EGAT Wind Turbine 5 MW Wind<br />

<strong>Power</strong> Purchase from Neighbouring Countries 700 MW Hydro 65,592 15.0<br />

2034 47,854 Retirement of Krabi TH #1 (Jan) -315 MW Heavy Oil<br />

Retirement of Chana CC #1 (Jan) -710 MW Gas<br />

Retirement of SPP -21 MW -<br />

VSPP 453 MW -<br />

Gas Turbine #1 250 MW Diesel<br />

Coal-Fired <strong>Power</strong> <strong>Plan</strong>t #5 (South) 1,000 MW Coal<br />

EGAT Biogas 5 MW Energy Crop<br />

EGAT Solar Cell 10 MW Solar<br />

<strong>Power</strong> Purchase from Neighbouring Countries 700 MW Hydro 66,965 15.0<br />

2035 48,713 Retirement of South Bangkok CC #3 (Jan) -710 MW Gas<br />

Retirement of Bang Pakong CC #5 (Jan) -710 MW Gas<br />

Retirement of Lao PDR (Nam Theun2) (Mar) -948 MW Hydro<br />

Retirement of SPP -90 MW -<br />

VSPP 489 MW -<br />

Gas Turbine #2-4 750 MW Diesel<br />

Coal-Fired <strong>Power</strong> <strong>Plan</strong>t #6 1,000 MW Coal<br />

Nuclear <strong>Power</strong> <strong>Plan</strong>t #1 1,000 MW Uranium<br />

EGAT Wind Turbine 10 MW Wind<br />

<strong>Power</strong> Purchase from Neighbouring Countries 700 MW Hydro 68,456 15.3<br />

<strong>2036</strong> 49,655 Retirement of North Bangkok CC #1 (Jan) -670 MW Gas<br />

VSPP 580 MW -<br />

Gas Turbine #5 250 MW Diesel<br />

Nuclear <strong>Power</strong> <strong>Plan</strong>t #2 1,000 MW Uranium<br />

EGAT Biogas 10 MW Energy Crop<br />

EGAT Solar Cell 10 MW Solar<br />

<strong>Power</strong> Purchase from Neighbouring Countries 700 MW Hydro 70,335 15.3<br />

Total Contract Capacity as of December 2014 37,612 MW<br />

Total Added Capacity 57,459 MW<br />

Total Retired Capacity -24,736 MW<br />

Grand Total Capacity at the End of <strong>2036</strong> 70,335 MW<br />

5-14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!