Thailand Power Development Plan 2015-2036
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table 5.4 (Continued)<br />
<strong>Thailand</strong> <strong>Power</strong> <strong>Development</strong> <strong>Plan</strong> (<strong>2015</strong>-<strong>2036</strong>)<br />
Peak Fuel Contract Minimum<br />
Year Demand Projects<br />
Types Capacity Reserve Margin<br />
(MW) (MW) (%)<br />
2033 47,025 Retirement of GPG CC #2 (Feb) -734 MW Gas<br />
Retirement of Ratchaburi <strong>Power</strong> CC #1 (Feb) -700 MW Gas<br />
Retirement of Ratchaburi <strong>Power</strong> CC #2 (May) -700 MW Gas<br />
VSPP 371 MW -<br />
Replacement of Bang Pakong TH #3-4 1,300 MW Gas<br />
Coal-Fired <strong>Power</strong> <strong>Plan</strong>t #4 1,000 MW Coal<br />
EGAT Wind Turbine 5 MW Wind<br />
EGAT Wind Turbine 5 MW Wind<br />
<strong>Power</strong> Purchase from Neighbouring Countries 700 MW Hydro 65,592 15.0<br />
2034 47,854 Retirement of Krabi TH #1 (Jan) -315 MW Heavy Oil<br />
Retirement of Chana CC #1 (Jan) -710 MW Gas<br />
Retirement of SPP -21 MW -<br />
VSPP 453 MW -<br />
Gas Turbine #1 250 MW Diesel<br />
Coal-Fired <strong>Power</strong> <strong>Plan</strong>t #5 (South) 1,000 MW Coal<br />
EGAT Biogas 5 MW Energy Crop<br />
EGAT Solar Cell 10 MW Solar<br />
<strong>Power</strong> Purchase from Neighbouring Countries 700 MW Hydro 66,965 15.0<br />
2035 48,713 Retirement of South Bangkok CC #3 (Jan) -710 MW Gas<br />
Retirement of Bang Pakong CC #5 (Jan) -710 MW Gas<br />
Retirement of Lao PDR (Nam Theun2) (Mar) -948 MW Hydro<br />
Retirement of SPP -90 MW -<br />
VSPP 489 MW -<br />
Gas Turbine #2-4 750 MW Diesel<br />
Coal-Fired <strong>Power</strong> <strong>Plan</strong>t #6 1,000 MW Coal<br />
Nuclear <strong>Power</strong> <strong>Plan</strong>t #1 1,000 MW Uranium<br />
EGAT Wind Turbine 10 MW Wind<br />
<strong>Power</strong> Purchase from Neighbouring Countries 700 MW Hydro 68,456 15.3<br />
<strong>2036</strong> 49,655 Retirement of North Bangkok CC #1 (Jan) -670 MW Gas<br />
VSPP 580 MW -<br />
Gas Turbine #5 250 MW Diesel<br />
Nuclear <strong>Power</strong> <strong>Plan</strong>t #2 1,000 MW Uranium<br />
EGAT Biogas 10 MW Energy Crop<br />
EGAT Solar Cell 10 MW Solar<br />
<strong>Power</strong> Purchase from Neighbouring Countries 700 MW Hydro 70,335 15.3<br />
Total Contract Capacity as of December 2014 37,612 MW<br />
Total Added Capacity 57,459 MW<br />
Total Retired Capacity -24,736 MW<br />
Grand Total Capacity at the End of <strong>2036</strong> 70,335 MW<br />
5-14