07.07.2017 Views

Thailand Power Development Plan 2015-2036

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

term (2022 – 2031) and Phase IV: long-term (2032 - <strong>2036</strong>). The five strategic areas of the<br />

Master <strong>Plan</strong> which will be a mechanism for the power system improvement to be more<br />

secured, sufficient, environment-friendly and effectively manageable, are as follows:<br />

Strategy 1: <strong>Power</strong> Reliability and Quality<br />

The power reliability and quality using as an indicator of the power system<br />

operation are the main concerned issues for three power utilities in <strong>Thailand</strong>. This strategy<br />

will be considered on the technical aspect which covers the capacity, reliability and<br />

quality of the power system. The smart grid development shall improve the power<br />

system in generation adequacy and continuity, and reduce the power quality problems in<br />

both voltage and current levels which may cause damage to equipment in the power<br />

system.<br />

Strategy 2: Energy Sustainability and Efficiency<br />

The consideration on sustainability and efficiency of energy generation and<br />

consumption is an issue which many countries worldwide are focusing on. The main<br />

reason is the need for new energy resources to replace the limited fossil-fueled and<br />

effective approaches for energy management to reduce fuel consumption and emission<br />

of greenhouse gases which is the global major issue at present. The smart grid<br />

development shall improve the energy generation and consumption to reduce the cost,<br />

to relieve the fuel resource procurement problem, to minimize the environmental impact<br />

and to accommodate the bulk renewable energy generation in the future.<br />

Strategy 3: Utility Operation and Service<br />

The consideration on utility operation and service has to be evaluated<br />

together with the development of technologies or innovation of smart grid since the<br />

application of smart grid system can imply that the performance of power system and<br />

utility itself have to be improved. Therefore, the performance indices shall be provided.<br />

Moreover, the smart grid development requires both operation and service performances<br />

of power utility to be more effective and more accurate which will help minimizing the<br />

operation time and improving services directly to customers.<br />

Strategy 4: Integration and Interoperability<br />

The consideration on integration and interoperability is a major issue which<br />

has to be carefully considered since smart grid development will involve a large amount<br />

of innovative equipments which will have information exchange and communication<br />

among them all the time. The integration of all equipments to accommodate a<br />

harmonized and standardized control system must be well organized. Moreover, the<br />

accessibility of renewable energy or end-user generation to the system and the grid-to-<br />

6-9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!