The AEDP would be integrated with the power demand forecasting in order to<br />

formulate the PDP<strong>2015</strong>. However, many limitations should be considered, for instance, the<br />

renewable energy potential and power demand of each region. Transmission and<br />

distribution system have not been planned for the large amount of power generated from<br />

Very Small <strong>Power</strong> Producers (VSPPs); therefore, there would be a possibility of reverse<br />

power flow problems which would increase losses in the power system.<br />

The AEDP developed by Department of Alternative Energy <strong>Development</strong> and<br />

Efficiency (DEDE) was approved by the National Energy Policy Council (NEPC) on December<br />

15, 2014 with the target on power generated from renewable energy in year <strong>2036</strong> of<br />

19,634.4 MW as show in Table 4.3.<br />

Table 4.3 the renewable and alternative energy targets of AEDP in <strong>2036</strong> (MW)<br />

Type <strong>Plan</strong>t Factor (%) Target 1/<br />

Solar<br />

6,000.0<br />

- Ground Mount<br />

- Rooftop<br />

16<br />

15<br />

Wind 18 3,002.0<br />

Hydro<br />

- ≤ 10 MW<br />

- > 10 MW<br />

44<br />

-<br />

3,282.4<br />

376.0<br />

2,906.4<br />

Municipal Waste 70 500.0<br />

Biomass 70 5,570.0<br />

Biogas (Waste water/Waste) 70 600.0<br />

Biogas (Energy crops) 78 680.0<br />

Remark: 1/ installed capacity<br />

Total 19,634.4<br />

The information required on the estimation of power demand is as follows: power<br />

consumption, distribution power requirement, EGAT sales, power requirement of EGAT<br />

system, and power requirement of the country. However, data collection of power plants<br />

linked outside EGAT system such as renewable power generation from VSPPs and DEDE as<br />

well as diesel generation from PEA has been facing challenges due to their large numbers of<br />

sites. Therefore, the installed capacity of VSPPs which would be used in the calculation on<br />

energy requirement of EGAT system and the country was estimated from the AEDP as shown<br />

in Table 4.4.<br />

4-4