2. For each activity, identify an activity driver and calculate the activity driver rates.<br />

<strong>Material</strong> Handling-- # of moves (in batches)<br />

Number of batches:<br />

Standard: 15,000 units / 30 units/batch = 500 batches<br />

Unique: 5,000 units / 10 units/batch = 500 batches<br />

Number of moves:<br />

Standard: 500 batches * 2 moves/batch = 1,000 moves<br />

Unique: 500 batches * 3 moves/batch = 1,500 moves<br />

2,500 moves<br />

$30,000 / 2,500 moves = $12/move<br />

Machine Set-up—Set-up hours<br />

Number of set-up hours:<br />

Standard: 500 batches * 4 hrs/batch = 2,000 hrs<br />

Unique: 500 batches * 6 hrs/batch = 3,000 hrs<br />

5,000 hrs<br />

$100,000 / 5,000 hrs = $20/set-up hr<br />

Engineering Support—Engineering hours<br />

$150,000 / 3,000 hrs = $50/hr<br />

Power for Machines—Machine hours<br />

Number of machine hours<br />

Standard: 15,000 units / 7.5 units/MH = 2,000 MHs<br />

Unique: 5,000 units / 2.5 units/MH = 2,000 MHs<br />

4,000 MHs<br />

$80,000 / 4,000 MHs = $20/MH<br />

Providing Space—Equally to each product line