Report on Progress Toward Security and Stability in - United States ...
Report on Progress Toward Security and Stability in - United States ...
Report on Progress Toward Security and Stability in - United States ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
force <strong>in</strong>tegrati<strong>on</strong> process, ITAG was able to work with the m<strong>in</strong>isterial mentors to <strong>in</strong>crease<br />
authorizati<strong>on</strong>s for the ANA facility pers<strong>on</strong>nel tashkil <strong>and</strong> improve <strong>on</strong> its corresp<strong>on</strong>d<strong>in</strong>g<br />
equipment set, which will provide the ANA with a more effective workforce to ma<strong>in</strong>ta<strong>in</strong> its<br />
facilities. ITAG recognizes the c<strong>on</strong>t<strong>in</strong>u<strong>in</strong>g need for ANSF Facility Eng<strong>in</strong>eers to delegate more<br />
technical services such as power plant, waste water treatment, <strong>and</strong> well operati<strong>on</strong>s to c<strong>on</strong>tractors;<br />
however, a more robust, <strong>in</strong>-house capability will reduce the need for expensive O&M services.<br />
With respect to tra<strong>in</strong><strong>in</strong>g, NTM-A is f<strong>in</strong>aliz<strong>in</strong>g plans for a sec<strong>on</strong>d semester of trade-specific<br />
coursework for approximately 50 students at the MoD’s C<strong>on</strong>structi<strong>on</strong> <strong>and</strong> Property Management<br />
Department (CPMD) course <strong>and</strong> 70 students at the Afghan Vocati<strong>on</strong>al Technical Trade Center<br />
(AKVTC). AKVTC, located <strong>in</strong> Kabul, tra<strong>in</strong>s students from both the MoD <strong>and</strong> MoI.<br />
Complement<strong>in</strong>g this centralized tra<strong>in</strong><strong>in</strong>g approach are <strong>in</strong>creases <strong>in</strong> c<strong>on</strong>tractor <strong>and</strong> ITAG<br />
leadership of <strong>on</strong>-the-job tra<strong>in</strong><strong>in</strong>g, the focus of which is more active learn<strong>in</strong>g, tailored to specific<br />
garris<strong>on</strong>s. ITAG <strong>and</strong> M<strong>in</strong>isterial Development are also work<strong>in</strong>g with the m<strong>in</strong>istries <strong>on</strong><br />
develop<strong>in</strong>g tra<strong>in</strong><strong>in</strong>g opportunities at local trade schools. This third tra<strong>in</strong><strong>in</strong>g opti<strong>on</strong> is an Afghan<br />
soluti<strong>on</strong> <strong>and</strong> produces more graduates at a lower cost than U.S.-c<strong>on</strong>tracted <strong>in</strong>structi<strong>on</strong>.<br />
Also dur<strong>in</strong>g the report<strong>in</strong>g period, ITAG c<strong>on</strong>t<strong>in</strong>ued close coord<strong>in</strong>ati<strong>on</strong> with the M<strong>in</strong>isterial<br />
Development Advisors dur<strong>in</strong>g <strong>in</strong>terface with both the MoD <strong>and</strong> MoI. Increased <strong>in</strong>teracti<strong>on</strong> with<br />
the m<strong>in</strong>istries will help ITAG solve the challenges faced at the garris<strong>on</strong> level. The transfer of<br />
facilities from the nati<strong>on</strong>al O&M c<strong>on</strong>tract to Afghan facility eng<strong>in</strong>eers is an area that requires<br />
close coord<strong>in</strong>ati<strong>on</strong> with ITAG <strong>and</strong> M<strong>in</strong>isterial Development. Through February 2012, ITAG has<br />
identified 2,566 build<strong>in</strong>gs to transiti<strong>on</strong> <strong>and</strong> facilitated transiti<strong>on</strong> of 217 of those to ANSF c<strong>on</strong>trol.<br />
The transfer of this <strong>in</strong>itial set was a major milest<strong>on</strong>e <strong>and</strong> has provided an example to follow at<br />
every site. C<strong>on</strong>t<strong>in</strong>ued support from the m<strong>in</strong>istries will be important for future facility transiti<strong>on</strong><br />
progress.<br />
FACILITY MANAGEMENT MINISTERIAL DEVELOPMENT<br />
NTM-A c<strong>on</strong>t<strong>in</strong>ues to advise the MoD CPMD <strong>in</strong> build<strong>in</strong>g capacity to run all facility operati<strong>on</strong>s<br />
<strong>and</strong> ma<strong>in</strong>tenance for the ANA by 2014. With the sign<strong>in</strong>g of a decree by the M<strong>in</strong>ister of Defense,<br />
CPMD now has direct c<strong>on</strong>trol over all ANA Facility Eng<strong>in</strong>eers. This decree <strong>and</strong> c<strong>on</strong>trol enables<br />
CPMD to provide oversight <strong>in</strong> hir<strong>in</strong>g <strong>and</strong> tra<strong>in</strong><strong>in</strong>g of facility eng<strong>in</strong>eers <strong>and</strong> provide budget<strong>in</strong>g<br />
<strong>and</strong> technical directi<strong>on</strong>. NTM-A mentors coord<strong>in</strong>ate directly with ITAG to l<strong>in</strong>k the Facility<br />
Eng<strong>in</strong>eer tra<strong>in</strong><strong>in</strong>g <strong>and</strong> transiti<strong>on</strong> at the ANA bases with CPMD to coord<strong>in</strong>ate hir<strong>in</strong>g <strong>and</strong><br />
budget<strong>in</strong>g <strong>and</strong> ensure the MoD is prepared to support the new facility eng<strong>in</strong>eer departments <strong>and</strong><br />
provide stewardship of the NTM-A c<strong>on</strong>structed facilities.<br />
As previously stated, the shuras address facility c<strong>on</strong>structi<strong>on</strong>, facility ma<strong>in</strong>tenance, <strong>and</strong> tashkil<br />
requirements to support facilities ma<strong>in</strong>tenance throughout the country. These events<br />
complement NTM-A’s participati<strong>on</strong> <strong>in</strong> the Facilities Department's plan to c<strong>on</strong>duct quarterly<br />
meet<strong>in</strong>gs <strong>in</strong> Kabul with z<strong>on</strong>e <strong>and</strong> prov<strong>in</strong>cial facilities eng<strong>in</strong>eers. NTM-A is focused <strong>on</strong> reexam<strong>in</strong><strong>in</strong>g<br />
the areas of focus <strong>in</strong> the M<strong>in</strong>isterial Development Plan (MDP) that, through<br />
mentor<strong>in</strong>g <strong>and</strong> advis<strong>in</strong>g the leadership of the facilities department, will develop the capability<br />
<strong>and</strong> capacity of the organizati<strong>on</strong> to progress from CM-3 to CM-2B. Due to the challenges<br />
associated with grow<strong>in</strong>g the facilities organizati<strong>on</strong> pers<strong>on</strong>nel, NTM-A is work<strong>in</strong>g with the MoI<br />
Facilities Department to restructure facility ma<strong>in</strong>tenance from a “hub-<strong>and</strong>-spoke” ma<strong>in</strong>tenance<br />
47