Expenditures on major capital projects in <strong>2007</strong><br />
Facility USD m<br />
Sinter division<br />
2 sinter stabilization units 76<br />
Lime calcination shaft kilns 23<br />
Blast furnace division<br />
Bell-less top charging devices 34<br />
#9 Blast Furnace overhaul 51<br />
<strong>Steel</strong>-smelting division<br />
#6 slab caster 41<br />
EAF Shop facilities 19<br />
Rolling division<br />
5,000 mm plate mill 191<br />
2,000 mm hot strip mill’s modernization 64<br />
Wet skin-pass on 2,500 mm cold rolling mill 26<br />
HDGL #2 49<br />
CCL #2 6<br />
Auxiliary services<br />
Storage areas’ revamping 17<br />
R/w terminals’ revamping 10<br />
In <strong>2007</strong> the following projects were implemented:<br />
Sintering division:<br />
Start-up of 2 sinter stabilization units which will improve the quality of sinter, thus reducing the consumption of<br />
iron ore materials and coke in the blast furnace and raising its productivity.<br />
Construction of 2 lime calcination shaft kilns to supply the newly commissioned steel-smelting facilities with<br />
quality lime.<br />
Blast Furnace Division:<br />
Installation of bell-less top charging devices (BTCD) on 2 blast furnaces. Such devices, coupled with the use of<br />
stabilized sinter, will allow to reduce the consumption of coke and raise the furnaces’ productivity. In the future it is<br />
planned to install BTCD’s on the other six furnaces, two of them in 2008.<br />
Rolling Division:<br />
Completion of the 2,000 mm hot strip mill’s modernization which will allow to step up its productivity to 6 mtpy,<br />
improve the quality and expand the product mix.<br />
Environment Protection:<br />
НThe most significant investment in the environment protection was be the revamping of the # 4<br />
desulphurization unit of the Sintering Division to reduce SO2 and dust emissions.<br />
Commissioning of the aspiration system on 3 production facilities. Work is underway to install similar systems on<br />
another 3 facilities.<br />
•<br />
•<br />
•<br />
•<br />
ANNUAL REPORT OPEN JOINT-STOCK COMPANY MAGNITOGORSK IRON & STEEL WORKS<br />
MMK’s capex in 2002-<strong>2007</strong> have amounted to USD 2.9 bn, which has allowed to:<br />
increase crude steel production from 10.3 to 13.3 mtpy;<br />
increase rolled steel production from 9.0 до 12.2 mtpy;<br />
increase the share of downstream products in the total output from 10% to 12%;<br />
decrease the wear degree of the fixed assets from 66% to 50%.<br />
SEASON <strong>2007</strong><br />
8