MIPIM 2022 (21 MB)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1<br />
As everyone in the industry knows, I have unlimited and unbridled optimism. The last two years have already shown what innovations that were<br />
actually long overdue can be developed. That‘s why we don‘t want to focus on specific asset classes but on innovations, such as the city of the<br />
future, a Moroccan park landscape in Favoriten, apartments for musicians in D-City, IT-Lab, etc.<br />
2<br />
Already 15 years ago, we were the first<br />
developers in Austria to achieve a LEED<br />
Platinum certification for their buildings.<br />
In the meantime, it has become state-ofthe-art<br />
and ESG criteria are now being<br />
requested more and more frequently. In<br />
recent years, realized that the pandemic<br />
has made home offices and single<br />
workplaces unavoidable and that openplan<br />
offices are infection hotspots par<br />
excellence.<br />
Wolfdieter Jarisch,<br />
S+B Gruppe<br />
3<br />
In the long term - the next five to ten years<br />
-- interest rates are expected to rise.<br />
4<br />
Courage to innovate, courage to protect the<br />
environment and courage to adopt a new<br />
approach to life balance.<br />
5<br />
DANUBEFLATS: the residential building - also known as Component 2 - will reach roof completion in the next few months. In the case of<br />
the residential tower, one of the most challenging technical tasks - the superstructure of the Danube embankment highway (Rucksack) - will<br />
be completed. DC 3, the largest and highest student building in Austria, is already being handed over on an ongoing basis. Likewise, the DC<br />
Residential will be completed. Civil engineering work on DC 2 will begin in the spring, and construction of the education campus will also start<br />
this year. At Höchstädtplatz, construction work on two residential complexes could start before Christmas. Furthermore, at Laxenburger Strasse<br />
151 six residential units will be built between the open space and garden concept designed by André Heller. The dedication procedures start for<br />
the City of the Future and the high-rise building near the gasometer (Taille) as well as the high-rise building at the foot of Triester Strasse. For the<br />
80-meter high-rise on Dresdner Strasse and Laxenburger Strasse 2, the groundbreaking ceremony will take place in the summer.<br />
<strong>MIPIM</strong> | <strong>2022</strong><br />
75