Annex II. Activities supported by the Government of F<strong>in</strong>land <strong>in</strong> the water sector 106<br />

Brief Information on Ongo<strong>in</strong>g and Pipel<strong>in</strong>e GOF supported Water Cluster Programs<br />

Programme Target region(s) Key outcome(s) Duration of support Funds allocated (EURO) Implementation Status<br />

Rural Water Supply and Amhara 1. Susta<strong>in</strong>able community schemes f<strong>in</strong>anced by the Community <strong>Development</strong> Fund (CDF) mechanism; 2. 07/2007 - 06/2011 (4 years) 9 MEUR grant from F<strong>in</strong>land, on-go<strong>in</strong>g<br />

Environment Programme<br />

Enabl<strong>in</strong>g environment for community based management <strong>in</strong> all (programme) woredas; 3. Competent, efficient and<br />

1.12 MEUR from GOE and<br />

(RWSEP) Phase IV<br />

responsive TA provided to strengthen<strong>in</strong>g Government capacity. 4. 1.2 million people served with clean potable<br />

1.15 MEUR <strong>in</strong>-cash and <strong>in</strong>-<br />

water and improved sanitaion services 5. Institutionalized capacity at region, zone and woreda level to susta<strong>in</strong><br />

k<strong>in</strong>d from the participat<strong>in</strong>g<br />

CDF<br />

communities.<br />

Rural Water Supply,<br />

Sanitation and Hygiene<br />

Programme (Beni WASH),<br />

Plann<strong>in</strong>g Phase (EFY 2001)<br />

Benishangul-<br />

Gumuz<br />

Rural Water Supply, Benishangul-<br />

Sanitation and Hygiene Gumuz<br />

Programme (F<strong>in</strong>nWash<br />

BG), Implementation Phase<br />

Support to Capacity<br />

Build<strong>in</strong>g Pooled Fund for<br />

WASH (WASH Pool)<br />

Support to WASH sectoral<br />

appoach via Water and<br />

Sanitation Programme<br />

(WSP) of The World Bank<br />

Support to Eastern Nile<br />

Technical Regional Office<br />

(ENTRO)<br />

ENTRO-IDEN Watershed<br />

<strong>Management</strong> Project,<br />

T&BIWRDP,<br />

Implementation Phase<br />

Susta<strong>in</strong>able Land<br />

Mangement<br />

Support<strong>in</strong>g Poverty<br />

Reduction through<br />

Economic Growth and<br />

Rural development<br />

ENTRO-IDEN Watershed<br />

<strong>Management</strong> Project,<br />

Implementation Phase<br />

Plann<strong>in</strong>g Phase expected results are: (i) assess the potential for hand dug wells and spr<strong>in</strong>g development us<strong>in</strong>g 03/2008 - 06/2009 (15<br />

CDF fund<strong>in</strong>g mechanism; def<strong>in</strong>e programme area and scope; (ii) Socio-cultural studies, (iii) Human Resources months)<br />

<strong>Development</strong> needs assessment, iv) Hydrological study completed to support technology choices and CDF<br />

applicability; (v) capacity build<strong>in</strong>g <strong>in</strong> pilot woredas, (vi) physical implementation piloted and 75 WPs constructed by<br />

06/2009, and (vii) Programme Document for implementation phase prepared, appraised and approved.<br />

2.15 MEUR grant from<br />

F<strong>in</strong>land, 0.07 MEUR from<br />

GOE and 0.037 MEUR <strong>in</strong>cash<br />

and <strong>in</strong>-k<strong>in</strong>d from the<br />

participat<strong>in</strong>g communities.<br />

Implementation Phase expected results are: (i) all communities <strong>in</strong> target areas provided with water supply via 07/2009 - 06/2013 (4 years) 11,37 MEUR grant<br />

CDF, target figure 1000 WPs; (ii) all rural dwellers sencouraged and technically supported to reach sanitation<br />

UAP; (iii) communities able to implement and manage water and sanitation facilities, <strong>in</strong>clud<strong>in</strong>g re-<strong>in</strong>vestment; (iv)<br />

woredas able to support communities; (v) regional bureaux able to coord<strong>in</strong>ate support to woredas; (vi) donors and<br />

NGOs able to implement CDF approach <strong>in</strong> their programmes.<br />

(<strong>in</strong>vestment + TA)<br />

The plann<strong>in</strong>g phase of the program started <strong>in</strong><br />

April 2008.The f<strong>in</strong>al draft of the program<br />

document is f<strong>in</strong>alized, based on an extensive<br />

appraisal.<br />

The procurement of TA consultancy f<strong>in</strong>ished,<br />

bilateral agreement with Ethiopia signed,<br />

commencement of work <strong>in</strong> July 2009.<br />

Ethiopia Coord<strong>in</strong>ated and enhanced capacity build<strong>in</strong>g support to the WASH sector 01/2009 - 12/2011 (3 years) Open The <strong>in</strong>tended Capacity-Build<strong>in</strong>g Pooled<br />

Fund idea has not materialized, GoF is<br />

realign<strong>in</strong>g its plans <strong>in</strong> order to def<strong>in</strong>e a<br />

feasible alternative for a sector capacity<br />

build<strong>in</strong>g <strong>in</strong>tervention. Proposals be<strong>in</strong>g<br />

drafted.<br />

Ethiopia Support the Regional states <strong>in</strong> the move to a sector-wide approach and the <strong>in</strong>troduction of Country Level Sector<br />

Information and Monitor<strong>in</strong>g Systems for the sector.<br />

Ethiopia, Egypt and Capacity Build<strong>in</strong>g support to Entro Office, contribut<strong>in</strong>g to the efforts of the Eastern Nile countries <strong>in</strong> better<br />

Sudan<br />

management of the River Nile as expressed <strong>in</strong> “2020 Operational Vision of the eastern Nile”<br />

Ethiopia, Amhara &<br />

Benishangul<br />

Gumuz<br />

Amhara and<br />

Benishangul<br />

Gumuz<br />

106 Status May/June 2009.<br />

TB Growth<br />

Corridor: Amhara<br />

and Benishangul<br />

Gumuz<br />

GoF <strong>in</strong>tends to provide f<strong>in</strong>ancial and technical support the Tana Beles Integrated Water Resources <strong>Development</strong><br />

Project of GoE and the World Bank. The project facilitates susta<strong>in</strong>able growth with<strong>in</strong> the Tana-Beles growth<br />

corridor, as identified <strong>in</strong> PASDEP, focus<strong>in</strong>g on capacity-build<strong>in</strong>g, and monitor<strong>in</strong>g and evaluation <strong>in</strong> the watershed<br />

management component of the project.<br />

Identification mission was conducted <strong>in</strong> March 2008, which recommended that GoF support SLM <strong>in</strong> Ethiopia,<br />

particularly <strong>in</strong> the topic of land adm<strong>in</strong>istration. The sector landscape has changesd somewhat s<strong>in</strong>ce then, and GoF<br />

is currently assess<strong>in</strong>g the situation based on the previous recommendations.<br />

GoF prepar<strong>in</strong>g a Concept Note concern<strong>in</strong>g possible support directly to the economic growth agenda ofthe Tana<br />

Beles Growth Corridor<br />

Sudan Prepared together regionally with, and a sister project to TBIWRMP; GoF is prepar<strong>in</strong>g a similar support to the<br />

EASTERN NILE WATERSHED MANAGEMENT PROJECT, support<strong>in</strong>g the Community Watershed <strong>Management</strong><br />

component<br />

01/2008 - 12/2010 (3 years) 1.15 MEUR grant The implementation is on go<strong>in</strong>g, trust fund<br />

agreement is signed with WB . The WASH<br />

M&E Frame Work is f<strong>in</strong>alized and is<br />

approved by all stakeholders<br />

10/2006 - 09/2009 (3 years) 1.0 MEUR <strong>in</strong> general budget<br />

support. Contribution<br />

channelled via Nile Bas<strong>in</strong><br />

Trust Fund (NBTF)<br />

adm<strong>in</strong>istered by WB<br />

2009 - 2012 5 MEUR: F<strong>in</strong>ancial<br />

contribution 3,5MEUR,<br />

Technical Assistance: 1,5<br />

MEUR<br />

on-go<strong>in</strong>g<br />

Trust Fund establishment with the World<br />

Bank <strong>in</strong> f<strong>in</strong>al stages. Selection of TA<br />

consultancy (watershed M&E) complete.<br />

Estimated time of commencement June<br />

2009<br />

2009 -2012 open Preparation mission for GOF engagement<br />

complete, mission recommendations under<br />

review<br />

2009- Open<br />

2009 - 2012 Maximum 9.25 MEUR;<br />

F<strong>in</strong>ancial Contribution 7Meur,<br />

Technical Assistance: 2,25<br />

Meur<br />

Initial plan to prepare for eventual<br />

engagement <strong>in</strong> 2010<br />

Expected date of effectiveness <strong>in</strong> 2009. TF<br />

agreement and TA TOR be<strong>in</strong>g drafted.<br />