Annex II. Activities supported by the Government of F<strong>in</strong>land <strong>in</strong> the water sector 106<br />
Brief Information on Ongo<strong>in</strong>g and Pipel<strong>in</strong>e GOF supported Water Cluster Programs<br />
Programme Target region(s) Key outcome(s) Duration of support Funds allocated (EURO) Implementation Status<br />
Rural Water Supply and Amhara 1. Susta<strong>in</strong>able community schemes f<strong>in</strong>anced by the Community <strong>Development</strong> Fund (CDF) mechanism; 2. 07/2007 - 06/2011 (4 years) 9 MEUR grant from F<strong>in</strong>land, on-go<strong>in</strong>g<br />
Environment Programme<br />
Enabl<strong>in</strong>g environment for community based management <strong>in</strong> all (programme) woredas; 3. Competent, efficient and<br />
1.12 MEUR from GOE and<br />
(RWSEP) Phase IV<br />
responsive TA provided to strengthen<strong>in</strong>g Government capacity. 4. 1.2 million people served with clean potable<br />
1.15 MEUR <strong>in</strong>-cash and <strong>in</strong>-<br />
water and improved sanitaion services 5. Institutionalized capacity at region, zone and woreda level to susta<strong>in</strong><br />
k<strong>in</strong>d from the participat<strong>in</strong>g<br />
CDF<br />
communities.<br />
Rural Water Supply,<br />
Sanitation and Hygiene<br />
Programme (Beni WASH),<br />
Plann<strong>in</strong>g Phase (EFY 2001)<br />
Benishangul-<br />
Gumuz<br />
Rural Water Supply, Benishangul-<br />
Sanitation and Hygiene Gumuz<br />
Programme (F<strong>in</strong>nWash<br />
BG), Implementation Phase<br />
Support to Capacity<br />
Build<strong>in</strong>g Pooled Fund for<br />
WASH (WASH Pool)<br />
Support to WASH sectoral<br />
appoach via Water and<br />
Sanitation Programme<br />
(WSP) of The World Bank<br />
Support to Eastern Nile<br />
Technical Regional Office<br />
(ENTRO)<br />
ENTRO-IDEN Watershed<br />
<strong>Management</strong> Project,<br />
T&BIWRDP,<br />
Implementation Phase<br />
Susta<strong>in</strong>able Land<br />
Mangement<br />
Support<strong>in</strong>g Poverty<br />
Reduction through<br />
Economic Growth and<br />
Rural development<br />
ENTRO-IDEN Watershed<br />
<strong>Management</strong> Project,<br />
Implementation Phase<br />
Plann<strong>in</strong>g Phase expected results are: (i) assess the potential for hand dug wells and spr<strong>in</strong>g development us<strong>in</strong>g 03/2008 - 06/2009 (15<br />
CDF fund<strong>in</strong>g mechanism; def<strong>in</strong>e programme area and scope; (ii) Socio-cultural studies, (iii) Human Resources months)<br />
<strong>Development</strong> needs assessment, iv) Hydrological study completed to support technology choices and CDF<br />
applicability; (v) capacity build<strong>in</strong>g <strong>in</strong> pilot woredas, (vi) physical implementation piloted and 75 WPs constructed by<br />
06/2009, and (vii) Programme Document for implementation phase prepared, appraised and approved.<br />
2.15 MEUR grant from<br />
F<strong>in</strong>land, 0.07 MEUR from<br />
GOE and 0.037 MEUR <strong>in</strong>cash<br />
and <strong>in</strong>-k<strong>in</strong>d from the<br />
participat<strong>in</strong>g communities.<br />
Implementation Phase expected results are: (i) all communities <strong>in</strong> target areas provided with water supply via 07/2009 - 06/2013 (4 years) 11,37 MEUR grant<br />
CDF, target figure 1000 WPs; (ii) all rural dwellers sencouraged and technically supported to reach sanitation<br />
UAP; (iii) communities able to implement and manage water and sanitation facilities, <strong>in</strong>clud<strong>in</strong>g re-<strong>in</strong>vestment; (iv)<br />
woredas able to support communities; (v) regional bureaux able to coord<strong>in</strong>ate support to woredas; (vi) donors and<br />
NGOs able to implement CDF approach <strong>in</strong> their programmes.<br />
(<strong>in</strong>vestment + TA)<br />
The plann<strong>in</strong>g phase of the program started <strong>in</strong><br />
April 2008.The f<strong>in</strong>al draft of the program<br />
document is f<strong>in</strong>alized, based on an extensive<br />
appraisal.<br />
The procurement of TA consultancy f<strong>in</strong>ished,<br />
bilateral agreement with Ethiopia signed,<br />
commencement of work <strong>in</strong> July 2009.<br />
Ethiopia Coord<strong>in</strong>ated and enhanced capacity build<strong>in</strong>g support to the WASH sector 01/2009 - 12/2011 (3 years) Open The <strong>in</strong>tended Capacity-Build<strong>in</strong>g Pooled<br />
Fund idea has not materialized, GoF is<br />
realign<strong>in</strong>g its plans <strong>in</strong> order to def<strong>in</strong>e a<br />
feasible alternative for a sector capacity<br />
build<strong>in</strong>g <strong>in</strong>tervention. Proposals be<strong>in</strong>g<br />
drafted.<br />
Ethiopia Support the Regional states <strong>in</strong> the move to a sector-wide approach and the <strong>in</strong>troduction of Country Level Sector<br />
Information and Monitor<strong>in</strong>g Systems for the sector.<br />
Ethiopia, Egypt and Capacity Build<strong>in</strong>g support to Entro Office, contribut<strong>in</strong>g to the efforts of the Eastern Nile countries <strong>in</strong> better<br />
Sudan<br />
management of the River Nile as expressed <strong>in</strong> “2020 Operational Vision of the eastern Nile”<br />
Ethiopia, Amhara &<br />
Benishangul<br />
Gumuz<br />
Amhara and<br />
Benishangul<br />
Gumuz<br />
106 Status May/June 2009.<br />
TB Growth<br />
Corridor: Amhara<br />
and Benishangul<br />
Gumuz<br />
GoF <strong>in</strong>tends to provide f<strong>in</strong>ancial and technical support the Tana Beles Integrated Water Resources <strong>Development</strong><br />
Project of GoE and the World Bank. The project facilitates susta<strong>in</strong>able growth with<strong>in</strong> the Tana-Beles growth<br />
corridor, as identified <strong>in</strong> PASDEP, focus<strong>in</strong>g on capacity-build<strong>in</strong>g, and monitor<strong>in</strong>g and evaluation <strong>in</strong> the watershed<br />
management component of the project.<br />
Identification mission was conducted <strong>in</strong> March 2008, which recommended that GoF support SLM <strong>in</strong> Ethiopia,<br />
particularly <strong>in</strong> the topic of land adm<strong>in</strong>istration. The sector landscape has changesd somewhat s<strong>in</strong>ce then, and GoF<br />
is currently assess<strong>in</strong>g the situation based on the previous recommendations.<br />
GoF prepar<strong>in</strong>g a Concept Note concern<strong>in</strong>g possible support directly to the economic growth agenda ofthe Tana<br />
Beles Growth Corridor<br />
Sudan Prepared together regionally with, and a sister project to TBIWRMP; GoF is prepar<strong>in</strong>g a similar support to the<br />
EASTERN NILE WATERSHED MANAGEMENT PROJECT, support<strong>in</strong>g the Community Watershed <strong>Management</strong><br />
component<br />
01/2008 - 12/2010 (3 years) 1.15 MEUR grant The implementation is on go<strong>in</strong>g, trust fund<br />
agreement is signed with WB . The WASH<br />
M&E Frame Work is f<strong>in</strong>alized and is<br />
approved by all stakeholders<br />
10/2006 - 09/2009 (3 years) 1.0 MEUR <strong>in</strong> general budget<br />
support. Contribution<br />
channelled via Nile Bas<strong>in</strong><br />
Trust Fund (NBTF)<br />
adm<strong>in</strong>istered by WB<br />
2009 - 2012 5 MEUR: F<strong>in</strong>ancial<br />
contribution 3,5MEUR,<br />
Technical Assistance: 1,5<br />
MEUR<br />
on-go<strong>in</strong>g<br />
Trust Fund establishment with the World<br />
Bank <strong>in</strong> f<strong>in</strong>al stages. Selection of TA<br />
consultancy (watershed M&E) complete.<br />
Estimated time of commencement June<br />
2009<br />
2009 -2012 open Preparation mission for GOF engagement<br />
complete, mission recommendations under<br />
review<br />
2009- Open<br />
2009 - 2012 Maximum 9.25 MEUR;<br />
F<strong>in</strong>ancial Contribution 7Meur,<br />
Technical Assistance: 2,25<br />
Meur<br />
Initial plan to prepare for eventual<br />
engagement <strong>in</strong> 2010<br />
Expected date of effectiveness <strong>in</strong> 2009. TF<br />
agreement and TA TOR be<strong>in</strong>g drafted.<br />