10.02.2013 Views

Serengeti General Management Plan

Serengeti General Management Plan

Serengeti General Management Plan

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Serengeti</strong> National Park <strong>General</strong> <strong>Management</strong> <strong>Plan</strong><br />

3.2.2: ReconstructBologonjapipeline<br />

in collaboration<br />

with major<br />

pipeline us-<br />

ers<br />

114<br />

The water extraction from<br />

the reconstructed pipeline is<br />

unsustainable<br />

structed at suitable intervals to inhibit<br />

water flow and erosion<br />

� Regular monitoring should be carried<br />

out to check the rehabilitation methods<br />

are successful and adapt methods<br />

should it be necessary<br />

� The flow rates of effected watercourses<br />

should be established<br />

(and/or recharge rates of underground<br />

resources)<br />

� Leak detection systems should be<br />

installed to facilitate future maintenance<br />

The specific Programme actions that will require a detailed Action/ Development Site Specific<br />

EIA 6 prior to implementation are:<br />

� Design and implementation of a new road construction programme for establishing and<br />

maintaining game viewing and anti-poaching tracks and loops (Action 3.1.3)<br />

� Develop Handajega airstrip as the principal airstrip servicing western SENAPA (Action<br />

3.1.4)<br />

6<br />

Guidelines and document format are provided in the TANAPA (1994b) as well as the TANAPA Strategic <strong>Plan</strong>ning<br />

Manual (1995a)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!