Serengeti General Management Plan
Serengeti General Management Plan
Serengeti General Management Plan
- TAGS
- serengeti
- www.zgf.de
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Serengeti</strong> National Park <strong>General</strong> <strong>Management</strong> <strong>Plan</strong><br />
3.2.2: ReconstructBologonjapipeline<br />
in collaboration<br />
with major<br />
pipeline us-<br />
ers<br />
114<br />
The water extraction from<br />
the reconstructed pipeline is<br />
unsustainable<br />
structed at suitable intervals to inhibit<br />
water flow and erosion<br />
� Regular monitoring should be carried<br />
out to check the rehabilitation methods<br />
are successful and adapt methods<br />
should it be necessary<br />
� The flow rates of effected watercourses<br />
should be established<br />
(and/or recharge rates of underground<br />
resources)<br />
� Leak detection systems should be<br />
installed to facilitate future maintenance<br />
The specific Programme actions that will require a detailed Action/ Development Site Specific<br />
EIA 6 prior to implementation are:<br />
� Design and implementation of a new road construction programme for establishing and<br />
maintaining game viewing and anti-poaching tracks and loops (Action 3.1.3)<br />
� Develop Handajega airstrip as the principal airstrip servicing western SENAPA (Action<br />
3.1.4)<br />
6<br />
Guidelines and document format are provided in the TANAPA (1994b) as well as the TANAPA Strategic <strong>Plan</strong>ning<br />
Manual (1995a)