10.02.2013 Views

Serengeti General Management Plan

Serengeti General Management Plan

Serengeti General Management Plan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Management</strong><br />

Targets<br />

<strong>Management</strong> Actions/ Activities<br />

1.2.1.4: Carry out a detailed feasibility study of sinks with special<br />

development needs (e.g. aerial walkway along Grumeti River, etc.)<br />

1.2.1.5: Develop cultural and historical sites as tourism sinks as<br />

appropriate<br />

1.2.1.6: Seek development funding (internal TANAPA and donor)<br />

for tourism sinks with special development needs and implement<br />

1.2.2: Develop overnight walking safaris in the Wilderness Zone<br />

according to the Limits of Acceptable Use<br />

1.2.2.1: Raise internal understanding and disseminate TANAPA<br />

Walking Safari Guidelines within SENAPA and eligible tour operators<br />

1.2.2.2: Approve Walking Safari Operators and guides in accordance<br />

with TANAPA Walking Safari Guidelines<br />

1.2.2.3: Implement safety regulations and ensure that Walking Safari<br />

Operators are aware of these<br />

1.2.2.4: Ground truth and designate walking safari blocks, with the<br />

walking route and camping locations defined, in collaboration with<br />

TATO and the Resource Protection Department<br />

1.2.2.5: Develop an infrastructure of short, dead-end access roads<br />

into the Wilderness Zone for camping locations<br />

1.2.2.6: Implement a one-year pilot scheme for walking safaris in<br />

designated blocks and evaluate the success<br />

1.2.3: Develop short interpretive trail walks from designated<br />

points, as appropriate<br />

Input<br />

requirements Responsibility<br />

Fuel,<br />

allowances,<br />

phonecalls<br />

Fuel,<br />

allowances,<br />

man hours<br />

Phone calls/fax,<br />

E-mails<br />

Man hours, fuel,<br />

allowances<br />

WT, PE<br />

WT<br />

WT<br />

TANAPA, WT<br />

Stationary TANAPA<br />

Fuel, phonecalls/fax,stationary,<br />

allowances<br />

Fuel, transport,<br />

allowances<br />

phonecall, fax<br />

Fuel,<br />

allowances,<br />

Fuel, ranger<br />

guide, 1st aid kit<br />

WT<br />

WP, WT, PE<br />

RI, WT, PE<br />

WT, PE, WP<br />

G. 3-Year Action <strong>Plan</strong><br />

Timeframe<br />

Year 1 Year 2 Year 3<br />

1 2 3 4 1 2 3 4 1 2 3 4<br />

123

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!