10.02.2013 Views

Defensor ABS2 Installation and Operating Instructions

Defensor ABS2 Installation and Operating Instructions

Defensor ABS2 Installation and Operating Instructions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

18<br />

Setting the flushing interval (SW2) (SU11/DU11 only)<br />

The flushing interval is the period between two flushing cycles. A timer built<br />

into the controller logs the time (based on the hours of operation of the<br />

atomizer). A flushing cycle is initiated each time the specified interval has<br />

elapsed.<br />

The time between two flushing cycles can be defined as 30, 60, 120 or 240<br />

minutes. The time to be set depends on the prevailing operating conditions<br />

(dustiness, water quality).<br />

Recommendation: – Very dusty conditions <strong>and</strong>/or hard water:<br />

Flushing interval 30 minutes<br />

– Normal dustiness <strong>and</strong>/or medium-hardness water:<br />

Flushing interval 60 - 120 minutes<br />

– Slight dustiness <strong>and</strong>/or demineralized water:<br />

Flushing interval 120 - 240 minutes<br />

Setting of switch SW2 Flushing interval in minutes<br />

1 30<br />

2 60<br />

3 120<br />

4 240<br />

Selection of the supply voltage (SW3)<br />

The <strong>ABS2</strong> supports two different voltage ranges. Selection of the appropriate<br />

supply voltage is done via switch SW3.<br />

Setting of switch SW3 Supply voltage<br />

115 100…115 VAC/50…60 Hz<br />

230 220…240 VAC/50…60 Hz<br />

To conclude setup work connect the grounding wire to the cover, then fix<br />

the cover with the 4 Phillips screws.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!