Defensor ABS2 Installation and Operating Instructions
Defensor ABS2 Installation and Operating Instructions
Defensor ABS2 Installation and Operating Instructions
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
18<br />
Setting the flushing interval (SW2) (SU11/DU11 only)<br />
The flushing interval is the period between two flushing cycles. A timer built<br />
into the controller logs the time (based on the hours of operation of the<br />
atomizer). A flushing cycle is initiated each time the specified interval has<br />
elapsed.<br />
The time between two flushing cycles can be defined as 30, 60, 120 or 240<br />
minutes. The time to be set depends on the prevailing operating conditions<br />
(dustiness, water quality).<br />
Recommendation: – Very dusty conditions <strong>and</strong>/or hard water:<br />
Flushing interval 30 minutes<br />
– Normal dustiness <strong>and</strong>/or medium-hardness water:<br />
Flushing interval 60 - 120 minutes<br />
– Slight dustiness <strong>and</strong>/or demineralized water:<br />
Flushing interval 120 - 240 minutes<br />
Setting of switch SW2 Flushing interval in minutes<br />
1 30<br />
2 60<br />
3 120<br />
4 240<br />
Selection of the supply voltage (SW3)<br />
The <strong>ABS2</strong> supports two different voltage ranges. Selection of the appropriate<br />
supply voltage is done via switch SW3.<br />
Setting of switch SW3 Supply voltage<br />
115 100…115 VAC/50…60 Hz<br />
230 220…240 VAC/50…60 Hz<br />
To conclude setup work connect the grounding wire to the cover, then fix<br />
the cover with the 4 Phillips screws.