<strong>Sierra</strong> <strong>Planning</strong> & <strong>Management</strong><br />

32<br />

32 <strong>Velodrome</strong> Business Plan – <strong>Town</strong> <strong>of</strong> <strong>Milton</strong><br />

� $260,000 for 1,300 square feet (121 m 2 ) <strong>of</strong> ancillary <strong>and</strong> other circulation type spaces (lobby space,<br />

corridors);<br />

� $59,800 for FFE; <strong>and</strong><br />

� $820,736 for s<strong>of</strong>t costs associated with the project.<br />

The value <strong>of</strong> $3.8 million for a 14,300 sq. ft. space equates to roughly $270 per sq. ft. capital cost including<br />

s<strong>of</strong>t costs.<br />

In translating these costs allocations to the <strong>Velodrome</strong> it is important to ask what is obtained in the<br />

<strong>Velodrome</strong> for a similar budget. Within the <strong>Velodrome</strong>, the infield space alone measures for playable<br />

surfaces (excluding portions <strong>of</strong> the infield at either end) over 20,000 sq. ft. This represents a 50% increase<br />

in the amount <strong>of</strong> gymnasium space compared with the 14,300 sq. ft. planned elsewhere.. In addition,<br />

dressing room <strong>and</strong> seating is provided in the <strong>Velodrome</strong> as part <strong>of</strong> the functional requirements <strong>of</strong> the<br />

building.<br />

As a broad estimate, even applying a unit rate <strong>of</strong> $300/sq. ft. to the gymnasium space would yield a value in<br />

the order <strong>of</strong> $6 million. This reflects therefore that the amount <strong>of</strong> space provided as well as the synergies<br />

with other elements in the building <strong>and</strong> therefore inherit cost reductions, result in significant value for<br />

money enhancements via the reallocation <strong>of</strong> the <strong>Town</strong> funds to the creation <strong>of</strong> gymnasium space within<br />

the <strong>Velodrome</strong> rather than a community centre.<br />

It should be noted that the unit rates are the basis for the overall capital costs for the <strong>Velodrome</strong> are likely<br />

to be in excess <strong>of</strong> $300 per sq. ft.<br />

6.3 STATUS OF FUNCTIONAL PROGRAM AND IMPACT ON CAPITAL COSTS<br />

The <strong>Town</strong> <strong>of</strong> <strong>Milton</strong> along with consulting team members are currently working with Toronto2015 <strong>and</strong><br />

Infrastructure Ontario <strong>and</strong> their retained project design consultant (PDC), B&H Architects, to address the<br />

need for greater specification the functional program to meet the needs <strong>of</strong> the <strong>Town</strong> <strong>of</strong> <strong>Milton</strong> <strong>and</strong> the<br />

potential users <strong>of</strong> the facility from the local community. The resulting statement <strong>of</strong> functional program will<br />

be subject to further capital cost estimates by Infrastructure Ontario <strong>and</strong> the results would be made known<br />

to the <strong>Town</strong> <strong>of</strong> <strong>Milton</strong> upon receipt <strong>of</strong> these estimates. It is likely, that a process <strong>of</strong> iteration will be<br />

required to achieve an appropriate balance between those functional spaces that are essential, those<br />

which are desired but not m<strong>and</strong>atory, <strong>and</strong> other opportunities as measured against the incremental capital<br />

costs associated with each item.<br />

In addition to redefining the functional space program to meet the specific needs <strong>of</strong> the <strong>Town</strong> <strong>of</strong> <strong>Milton</strong>,<br />

potential cost implications (reductions <strong>and</strong>/or cost additions) associated with the proposed site for<br />

development <strong>of</strong> the <strong>Velodrome</strong> will also impact the overall cost to the Municipality. The Municipality is<br />

required to fund 100% <strong>of</strong> l<strong>and</strong> related capital costs including any costs for the l<strong>and</strong> itself, site works <strong>and</strong><br />

servicing to the property, <strong>and</strong> any environmental remediation or other extraordinary capital costs that may<br />

be incurred.<br />

Several items which will affect the cost include:<br />

� The potential for a district heating system based on geo-thermal energy which may ultimately<br />

reduce the operating costs associated with building utilities, as well as impact the capital cost<br />

associated with the heating <strong>and</strong> cooling system in place for the facility.<br />

Business Plan | January 2012