case <strong>of</strong> chariging exchanger-surface area to accommodate<br />
changes in flow and temperature conditions by<br />
adding or removing plates.<br />
For instance in this application, as individual<br />
buildings eome on line, plates could be<br />
added. Since <strong>the</strong> plates are in parallel, flow is<br />
increased while pressure drops reraain <strong>the</strong> same and<br />
inlet and outlet temperatures reraain <strong>the</strong> same.<br />
Small changes in/seeondary loop inlet temperature<br />
(or priraary for that.matter.) can-be accommodated by<br />
adding or reim.ving plates and still maintairi outlet'temperature.<br />
Where-large secondary inlet water<br />
temperature changes are raaae (for instance, if<br />
all buildings changed from a 40°F T to 6d°F T) it<br />
may be necessary to series portions <strong>of</strong> <strong>the</strong> exr<br />
ehanger. This can be accomplished with external<br />
pluratiing while using <strong>the</strong> same exchanger plates arid<br />
adding, a blocking plate between <strong>the</strong>" seried sections.<br />
Design Recommendations. For <strong>the</strong> initial 14building<br />
district 2 plate-type heat, exchangers are<br />
arranged in parallel with automatic controls to<br />
stage <strong>the</strong> flow in both <strong>the</strong> pumps and exchangers.<br />
Thus, loads' up to 50i <strong>of</strong> peak will be handled by<br />
one pump and exchanger,, reducing pum"pihg costs and<br />
provi di rig maintenance time. One unit, will prpvide'<br />
<strong>the</strong> heat required approximately 65% <strong>of</strong> <strong>the</strong>' time<br />
during <strong>the</strong> Klamath Fa-lls heating_ season.<br />
The exchangers will be selected to operate at<br />
<strong>the</strong> mini [iiura flows required fpr domes tic, water heating<br />
during surmer months arid also allow <strong>the</strong>, addition<br />
<strong>of</strong> plate's to handle inc'reased loads while<br />
maintaining inlet-and ,outlet temperatures as <strong>the</strong><br />
district is expanded.<br />
plate heat exchanger general s'pecif icati ons:<br />
Type - Single pass with 150<br />
• 316, sst plates EPDM gaskets<br />
Size - 9'3" long x 1'7" y/ide x 5' high<br />
makirtium platage<br />
Geo<strong>the</strong>rmal side - 219°F Tnlet<br />
175°F Outlet<br />
4.3 psig pressure drop<br />
(1,000 gpm maximum<br />
flow with full<br />
platage.)<br />
350: gprii flow<br />
Secondary "side - eOQ^F Outlet<br />
160°F Inlet<br />
3.7 ps.ig pressure ;idrop<br />
(1,000 gpra raaximum<br />
flbw.wi'th full<br />
piatage)<br />
376 gf)m flow<br />
Cost - .$14,000 ea. - 2'required<br />
Life <strong>of</strong> <strong>the</strong> '316 sst plates is expected to be 30<br />
years qr more in <strong>the</strong> Klamath Falls geo<strong>the</strong>rmal waters...<br />
Gasket life, is expec.ted to ,be 5 years v/ith'<br />
frequent cleaning, and gasket cost is $41 each-<br />
The unit tan be disassembled for .cleaning and reassembled<br />
in 4 hours by 2 riieri. Additional plates<br />
for future expansion cost, $80 each including, gaskets."<br />
Estimated maintenaricl costs—5 years--<br />
$6,340.<br />
389<br />
Pumps<br />
Lund, et. al.<br />
Production Well -Puraps. The productipn well<br />
pujiips are vertical turbine v/ith variable speed<br />
fluid drive. The variable ispeed drive provides<br />
for coritinuous. operation <strong>of</strong> <strong>the</strong> pumps to provi die<br />
constant pressureat <strong>the</strong> well head and in <strong>the</strong> supply<br />
iirie urider varying flow requireraents. Pump<br />
discharge pressure is monitored by <strong>the</strong> fluid coup-<br />
Itng control which changes turbine shaft speed to<br />
mairitain constant discharge pressure Troin rio-flow<br />
to full-flow conditions and eTiiiii nates <strong>the</strong> need<br />
for stoi'age tanks required with iritermittent,pump'<br />
operation. The turbine shaft is always rotating<br />
proyiding lubrication for reduced bearing and.<br />
shaft wear, <strong>the</strong> drives have proven successful in<br />
<strong>the</strong> Oregon rrfstitute <strong>of</strong> Technology and Presbyterian<br />
Intercommunity Hospital systeras; v/here it is estimated<br />
that bearing, sKaft, and raotor li-fie have-been<br />
doubled.<br />
-Vertical turbine-pumps are selected by choosing<br />
<strong>the</strong> most economical combination <strong>of</strong> pulrif bov/1<br />
arid nuraber <strong>of</strong> stages that will produce <strong>the</strong>.desired<br />
pressure and flow rates,. Attention must be giveri<br />
to efficiency arid'where variable speeds are a r^equiferaent,<br />
<strong>the</strong> pump curve should be ,as flat as possible<br />
to maintain high overall wire-to-water<br />
efficiency.<br />
Well Head Pumps.<br />
Vertical turbine witli variable . ;peed drive:<br />
.Rated flow at 1750 RPM<br />
500 gpm<br />
Column length<br />
350 ft<br />
Golumn diameter<br />
Sowl diameter<br />
8 in<br />
9 3/4. iri<br />
Shaft diameter.<br />
1 1/2 in<br />
Number <strong>of</strong> bov/ls<br />
11<br />
Discharge' p'ressure<br />
20 psi<br />
Motor (electric)<br />
Drive - torque, converter type<br />
2i,slip at full load.<br />
75 hp<br />
Rated Capacity<br />
75 hp<br />
Wire-to-water efficiency<br />
Current cost<br />
72%<br />
$41 ,-488<br />
'Number requi red .<br />
Estiraated maintenance costs;:<br />
2 ea<br />
Change packing .S-lubricate, 6- mo.<br />
interval<br />
Pull pump', inspect S replace<br />
$29<br />
bearirigs, 3-year iritervals<br />
Overhaul variable speed drive,<br />
$4,000<br />
5-year interval<br />
$580<br />
Ih.i'ection Pump. Since <strong>the</strong> museum well has<br />
been selected as <strong>the</strong> injection site, and since <strong>the</strong>.<br />
well is; a flowing artesian v/ell,, an inj.ection pump<br />
will be required. It is assumed that injection<br />
pressures foir a goOd producing well, are .approxiriately<br />
equal to <strong>the</strong> drawdown pressures plus any artesian-pressure<br />
when that well is used for injection.<br />
This has been experienced at Raft River arid<br />
in Klaraath Falls. Additional pumping pressure <strong>of</strong><br />
ab_qut ;25% is recommended to account for <strong>the</strong> difference<br />
in temperature when irijectiori temperatures are<br />
Ipwer than pr'oduction temperatures, gradual fouling