similar objectives of the Project Sponsor, have relatively the same or reduced environmental<br />

impacts, and can be implemented in a timeframe similar to that of the proposed action, should<br />

be considered. Section 6197.9(b)(5)(v) of the SEQRA regulations further provides that the<br />

description and evaluation of each alternative should be at a level of detail sufficient to permit<br />

a comparative assessment of the alternatives discussed, but will vary with the circumstances<br />

and natures of each alternative.<br />

The following alternatives to the Project are described and evaluated below: No-Build<br />

Alternative; an Existing Zoning Alternative; a Cluster Residential Alternative; and the Preferred<br />

Alternative. These alternatives offer potential ranges and scopes of development, and are<br />

evaluated at a detailed level to allow for comparative analysis and consideration as dictated by<br />

the SEQRA provisions discussed above.<br />

The basic and overall purpose of the Project is to develop a shovel-ready technology<br />

manufacturing site in Western New York. The Project targets green-technology and advanced<br />

manufacturing companies involved in developing and manufacturing clean technology,<br />

renewable energy and/or energy efficiency products. These companies include photovoltaic<br />

solar cell manufacturing (PV-Solar), flat panel display manufacturing including medical imaging<br />

display, bio-pharmaceutical/nanotechnology-enabled industries, and green technology<br />

research and development for energy efficient building products.<br />

An enhanced list of design parameters was established to better assess site viability against<br />

local conditions and requirements. The specific requirements of a particular site to achieve the<br />

basic and overall purpose of the Project include:<br />

Must be a site greater than 1,000 acres with 500 acres suitable for low density, campus<br />

style development.<br />

Must be a large and virtually flat site with manageable environmental constraints.<br />

Must be in reasonable proximity and accessibility from freeway and major airport.<br />

Must have or be able to obtain high quality, redundant, low cost energy in the range of<br />

50-200 megawatts (MW).<br />

Must be within a 30-mile radius of the NY Power Authority’s Niagara hydropower zone<br />

surrounding Niagara Falls to qualify for low cost hydropower in significant quantities to<br />

support large-scale technology and advanced manufacturing operations.<br />

Must be within a 60-minute drive of local and regional labor markets allowing targeted<br />

companies to attract qualified employees.<br />

Must be near available water and sewer infrastructure or have the ability to expand<br />

existing systems.<br />

Must have support of the local community<br />

6