NEW YORK STATE URBAN DEVELOPMENT CORPORATION d/b/a ...
NEW YORK STATE URBAN DEVELOPMENT CORPORATION d/b/a ...
NEW YORK STATE URBAN DEVELOPMENT CORPORATION d/b/a ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Cluster Residential Alternative<br />
The Cluster Residential Alternative would be planned according to the Cluster Zoning provisions<br />
as permitted by the Town of Alabama Zoning Law. Natural areas and open space are the focus<br />
of cluster development, and residential lots are requisitely down-sized due to the amount of<br />
open space surrounding them (i.e., minimum 25% of Project Site).<br />
Development of the Project Site in a cluster scenario would likely require the introduction of<br />
Town-scale water and sewer systems to accommodate the closely-spaced residences. A large<br />
number of public roads would have to be constructed as well, since an interconnected network<br />
of streets would be required to develop the site in a dense manner as allowed under cluster<br />
zoning.<br />
Again, throughout the community input process conducted for the Project over the past several<br />
years, Town of Alabama elected officials and citizens voiced significant opposition to additional<br />
residential development in the town.<br />
Development of significant residential structures would also eliminate the natural, open vistas<br />
characteristic of agriculturally-based communities. New houses would be easily viewed from<br />
existing public roads, and would line streets within the cluster residential neighborhood.<br />
Furthermore, the cluster residential alternative would not ensure the preservation of open<br />
spaces, wetlands and water resources, as well as potential archeological resources.<br />
Residential development consistent with the existing Town of Alabama zoning requirements<br />
would result in a significant burden being placed on the Town of Alabama community services<br />
such as fire, police and ambulatory services. Market studies show that widespread residential<br />
development results in an increased burden being placed on such services without a<br />
concomitant increase in a community’s tax base to cover the expense of such additional<br />
demands, as discussed above.<br />
Preferred Alternative<br />
The Preferred Alternative is the establishment of a high technology campus at the Project Site<br />
planned to accommodate over 6 million square feet of advanced technology manufacturing<br />
uses at full build-out, providing direct employment for over 9,000 people. Phase 1 is planned to<br />
attract an anchor technology manufacturing facility potentially comprised of 1 million square<br />
feet. Once secured, the anchor facility will attract a variety of technology manufacturing<br />
support uses and supporting commercial enterprises.<br />
In alignment with the Town of Alabama’s wishes to create employment opportunities to retain<br />
local residents, the Preferred Alternative provides a number of new jobs during both the<br />
construction and operation phases of the Project. No private residences will be developed at<br />
the Project Site.<br />
10