Cluster Residential Alternative<br />

The Cluster Residential Alternative would be planned according to the Cluster Zoning provisions<br />

as permitted by the Town of Alabama Zoning Law. Natural areas and open space are the focus<br />

of cluster development, and residential lots are requisitely down-sized due to the amount of<br />

open space surrounding them (i.e., minimum 25% of Project Site).<br />

Development of the Project Site in a cluster scenario would likely require the introduction of<br />

Town-scale water and sewer systems to accommodate the closely-spaced residences. A large<br />

number of public roads would have to be constructed as well, since an interconnected network<br />

of streets would be required to develop the site in a dense manner as allowed under cluster<br />

zoning.<br />

Again, throughout the community input process conducted for the Project over the past several<br />

years, Town of Alabama elected officials and citizens voiced significant opposition to additional<br />

residential development in the town.<br />

Development of significant residential structures would also eliminate the natural, open vistas<br />

characteristic of agriculturally-based communities. New houses would be easily viewed from<br />

existing public roads, and would line streets within the cluster residential neighborhood.<br />

Furthermore, the cluster residential alternative would not ensure the preservation of open<br />

spaces, wetlands and water resources, as well as potential archeological resources.<br />

Residential development consistent with the existing Town of Alabama zoning requirements<br />

would result in a significant burden being placed on the Town of Alabama community services<br />

such as fire, police and ambulatory services. Market studies show that widespread residential<br />

development results in an increased burden being placed on such services without a<br />

concomitant increase in a community’s tax base to cover the expense of such additional<br />

demands, as discussed above.<br />

Preferred Alternative<br />

The Preferred Alternative is the establishment of a high technology campus at the Project Site<br />

planned to accommodate over 6 million square feet of advanced technology manufacturing<br />

uses at full build-out, providing direct employment for over 9,000 people. Phase 1 is planned to<br />

attract an anchor technology manufacturing facility potentially comprised of 1 million square<br />

feet. Once secured, the anchor facility will attract a variety of technology manufacturing<br />

support uses and supporting commercial enterprises.<br />

In alignment with the Town of Alabama’s wishes to create employment opportunities to retain<br />

local residents, the Preferred Alternative provides a number of new jobs during both the<br />

construction and operation phases of the Project. No private residences will be developed at<br />

the Project Site.<br />