Test Plan for Optical Grooming Switches - Light Reading
Test Plan for Optical Grooming Switches - Light Reading
Test Plan for Optical Grooming Switches - Light Reading
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
• Switch management system alarm cleared because fibre is fixed<br />
• Trail is still routed via 2 hop route<br />
• The management system should clearly display the following;<br />
Current route and status.<br />
Available resources.<br />
Other comments:<br />
None<br />
<strong>Test</strong> <strong>Plan</strong> <strong>for</strong> <strong>Optical</strong> <strong>Grooming</strong> <strong>Switches</strong><br />
TCA012a: Confirm that the user can request automatic reoptimisation of circuit routings.<br />
Purpose:<br />
Following a restoration event circuits may be following non-optimal routes with long-term<br />
detrimental impact on availability. At a time of the operator’s choosing it would there<strong>for</strong>e be<br />
required to ask the system to automatically reoptimise circuit routings<br />
<strong>Test</strong> method:<br />
1. Following on from successful completion of TCA011<br />
2. Ask the switch management system to reoptimise circuit routings<br />
3. Record duration of loss of traffic<br />
Expected result:<br />
• STS-1 circuit should be rerouted back to original single hop route<br />
• Measure duration of traffic loss on STS-1 circuit<br />
• VC4-4c circuit should be unaffected<br />
• The management system should clearly display the following;<br />
Current route and status.<br />
Available resources.<br />
Other comments:<br />
None<br />
TCA012b: Confirm operation of 1+1 MSP<br />
Purpose:<br />
To confirm operation of (non-revertive) 1+1 MSP<br />
<strong>Test</strong> method:<br />
1. Start off with Config A with no trails configured<br />
2. Set up unprotected STS-1 trail from PAR#8-LON#5 and connect to SONET testers<br />
3. Set up unprotected STS-3c trail from PAR#10-LA#8 and connect to SONET testers<br />
4. Look on management system and ensure STS-1 is being carried over PAR#6-LON#2<br />
working route (if not do a manual switch to make sure it is)<br />
5. Pull out card PAR#6<br />
6. Measure loss of traffic on SONET testers<br />
7. Record alarms on management system<br />
Expected result:<br />
• STS-1 should see less than 50 ms loss of traffic<br />
• Switch management system should clearly show STS-1 is now being carried over<br />
PAR#7-LON#1 trunk<br />
• STS-3c should see no loss of traffic<br />
• Within 10 seconds alarm appears on network management system to show card<br />
failure of PAR#6<br />
• The management system should clearly display the following;<br />
22