Test Plan for Optical Grooming Switches - Light Reading
Test Plan for Optical Grooming Switches - Light Reading
Test Plan for Optical Grooming Switches - Light Reading
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Test</strong> <strong>Plan</strong> <strong>for</strong> <strong>Optical</strong> <strong>Grooming</strong> <strong>Switches</strong><br />
STS-3c circuit should be mesh restored via 2 hops route – confirm on<br />
management system<br />
Record duration of loss of traffic on STS-3c circuit<br />
Other comments:<br />
None<br />
TCA019: Break both working and protection fibres in BLSR<br />
Purpose:<br />
To confirm that when both working and protection arms on BLSR are failed then mesh<br />
restoration takes place<br />
<strong>Test</strong> method:<br />
1. Following on from successful completion of TCA017 and TCA018 one fibre in the BLSR<br />
has already been broken. Now break the other one<br />
Expected result:<br />
Mesh restoration should take place on STS-1 circuit<br />
Record duration of loss of traffic on STS-1 circuit<br />
Switch management system should now show STS-1 circuit routed via NY#3-<br />
PAR#5-LA<br />
STS-3c circuit should be unaffected<br />
Other comments:<br />
None<br />
TCA20: Creation of protected trail.<br />
Purpose:<br />
To confirm the ability to create an SNCP protected circuit across the network.<br />
<strong>Test</strong> method:<br />
1. Start off with Configuration A, with no trails configured.<br />
2. Using the switch management system, create an SNCP protected STS-1 trail from PAR#8<br />
to NY#6<br />
3. Confirm the trail is working error free<br />
4. Set up an unprotected STS-3c trail from PAR#9-NY#7<br />
Expected result:<br />
• SDH testers report error free transmission.<br />
• Switch management reports no alarms or warning.<br />
• Switch management system clearly shows routing of the protected circuit – working<br />
via PAR#5-NY#3 and protection via 2 hop route (not important which)<br />
• Check the following are clearly and accurately displayed within the network view of<br />
the Management system:<br />
Current route and status.<br />
Protection route.<br />
Available resources.<br />
Any other comments:<br />
Is a screen refresh required to obtain a current view of the network?<br />
Is there an auto refresh or cycle time to refresh all ports on nodes?<br />
TCA021: Operate SNC protection (non revertive) in event of fibre cut<br />
25