06.08.2013 Views

Test Plan for Optical Grooming Switches - Light Reading

Test Plan for Optical Grooming Switches - Light Reading

Test Plan for Optical Grooming Switches - Light Reading

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Test</strong> <strong>Plan</strong> <strong>for</strong> <strong>Optical</strong> <strong>Grooming</strong> <strong>Switches</strong><br />

STS-3c circuit should be mesh restored via 2 hops route – confirm on<br />

management system<br />

Record duration of loss of traffic on STS-3c circuit<br />

Other comments:<br />

None<br />

TCA019: Break both working and protection fibres in BLSR<br />

Purpose:<br />

To confirm that when both working and protection arms on BLSR are failed then mesh<br />

restoration takes place<br />

<strong>Test</strong> method:<br />

1. Following on from successful completion of TCA017 and TCA018 one fibre in the BLSR<br />

has already been broken. Now break the other one<br />

Expected result:<br />

Mesh restoration should take place on STS-1 circuit<br />

Record duration of loss of traffic on STS-1 circuit<br />

Switch management system should now show STS-1 circuit routed via NY#3-<br />

PAR#5-LA<br />

STS-3c circuit should be unaffected<br />

Other comments:<br />

None<br />

TCA20: Creation of protected trail.<br />

Purpose:<br />

To confirm the ability to create an SNCP protected circuit across the network.<br />

<strong>Test</strong> method:<br />

1. Start off with Configuration A, with no trails configured.<br />

2. Using the switch management system, create an SNCP protected STS-1 trail from PAR#8<br />

to NY#6<br />

3. Confirm the trail is working error free<br />

4. Set up an unprotected STS-3c trail from PAR#9-NY#7<br />

Expected result:<br />

• SDH testers report error free transmission.<br />

• Switch management reports no alarms or warning.<br />

• Switch management system clearly shows routing of the protected circuit – working<br />

via PAR#5-NY#3 and protection via 2 hop route (not important which)<br />

• Check the following are clearly and accurately displayed within the network view of<br />

the Management system:<br />

Current route and status.<br />

Protection route.<br />

Available resources.<br />

Any other comments:<br />

Is a screen refresh required to obtain a current view of the network?<br />

Is there an auto refresh or cycle time to refresh all ports on nodes?<br />

TCA021: Operate SNC protection (non revertive) in event of fibre cut<br />

25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!