Expected result:<br />

Traffic on STS-1 trail should not be affected<br />

Alarm should be raised on switch management system within 10 seconds<br />

indicating card out<br />

Any other comments:<br />

BTexact to select the most suitable card depending on equipment implementation<br />

END OF BLOCK 12<br />

BLOCK 13. Node Failure and 1:N transponder protection on WDM system<br />

<strong>Test</strong> Block description:<br />

Procedure:<br />

Blocks of tests to proceed in sequence from TCA063 to TC065.<br />

TCA063: Node failure and trail restoration<br />

Purpose:<br />

If an entire node is destroyed in a ring network, as many as possible of the circuits passing<br />

through the node should be switched/restored<br />

<strong>Test</strong> method:<br />

1. Start off with “clean” configuration A – no alarms and no trails configured<br />

2. Break fibre PAR#5-NY#3<br />

3. Set up unprotectedSTS-1 trail from PAR#8-NY#6 and monitor traffic over it using<br />

4. Pull out all fuses (one at a time) on London node (assuming 2.5G circuit is routed via<br />

London – if via LA then use LA instead) – thus killing the node<br />

5. Confirm traffic is restored<br />

Expected results:<br />

• Single fuse removal should not be traffic affecting.<br />

• 2.5G Paris-NY circuit should be re-routed. Record the new route and the duration of<br />

any loss of traffic.<br />

• Alarms should be raised to indicate loss of node<br />

Any other comments:<br />

None<br />

TCA064: <strong>Test</strong> reboot of failed node<br />

Purpose:<br />

To see what happens when London node is on again<br />

<strong>Test</strong> method:<br />

1. Follows on from successful completion of TCA063<br />

2. Replace the fuses in London node and wait until the node is up again<br />

3. Monitor and note node rack alarms<br />

4. Monitor and management system and note time period from power on to node appears as<br />

present on management system.<br />

Expected results:<br />

46