06.08.2013 Views

Test Plan for Optical Grooming Switches - Light Reading

Test Plan for Optical Grooming Switches - Light Reading

Test Plan for Optical Grooming Switches - Light Reading

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Protection route.<br />

Available resources.<br />

Any other comments:<br />

None<br />

TCA024: Fail protection arm of 1+1 SNCP<br />

Purpose:<br />

Confirm correct operation of 1+1 SNCP circuit in event of loss of protection<br />

<strong>Test</strong> <strong>Plan</strong> <strong>for</strong> <strong>Optical</strong> <strong>Grooming</strong> <strong>Switches</strong><br />

<strong>Test</strong> method:<br />

1. Following on from successful completion of TCA023<br />

2. Use switch management system to identify protection route <strong>for</strong> the 1+1 protected SNCP<br />

circuit – and break a fibre on that protection route<br />

Expected result:<br />

• No loss of traffic on either STS-1 or STS-3c circuit<br />

• Alarm raised to indicate and locate loss of protection<br />

• Mesh restoration takes place to set up a “new” protection route – so we again end up<br />

with 1+1 protected circuit<br />

Any other comments:<br />

None<br />

TCA25: <strong>Test</strong> operation of SNCP circuit in dual fault scenario<br />

Purpose:<br />

Confirm that when both working and protection arms of 1+1 SNC circuit are broken then<br />

mesh restoration takes place<br />

<strong>Test</strong> method:<br />

1. Following on from successful completion of TCA023<br />

2. Break fibre PAR#5-NY#3 (working path <strong>for</strong> STS-1 circuit)<br />

Expected result:<br />

• Protection switching should now take place onto the “new” protection arm<br />

• STS-1 circuit sees sub-50ms traffic loss<br />

• New routing is obvious from switch management system<br />

Any other comments:<br />

None<br />

BLOCK 3. Trail reservation and Inverse Multiplexing.<br />

END OF BLOCK 2<br />

<strong>Test</strong> Block description:<br />

Creation of a OC-192 trail over four x OC-48 trunks. Reserving network resources<br />

<strong>for</strong> later use.<br />

Procedure:<br />

Blocks of tests to proceed in sequence from TCA26 to TCA31<br />

27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!