06.08.2013 Views

Test Plan for Optical Grooming Switches - Light Reading

Test Plan for Optical Grooming Switches - Light Reading

Test Plan for Optical Grooming Switches - Light Reading

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Test</strong> method:<br />

1. Start with Config A and no trails configured<br />

2. Break fibres PAR#2-LA#2, PAR#3-LA#3, PAR#4-LA#4<br />

3. Connect Agilent SONET/SDH testers to PAR#8 and LA#8<br />

4. Simultaneously set up following unprotected trails from PAR#8-LA#8<br />

♦ 3 off STS-12c<br />

♦ 3 off STS-3c<br />

♦ 2 off STS-1<br />

<strong>Test</strong> <strong>Plan</strong> <strong>for</strong> <strong>Optical</strong> <strong>Grooming</strong> <strong>Switches</strong><br />

Expected result:<br />

All trails should be error free<br />

Switch management system should show all trails being routed via PAR#1-LA#1<br />

trunk<br />

Switch management system should show one spare STS-1 on PAR#1-LA#1 trunk<br />

Any other comments:<br />

None<br />

TCA039a: Confirm virtual concatenation of STS-1s<br />

Purpose:<br />

To confirm support <strong>for</strong> virtual concatenation of STS-1<br />

<strong>Test</strong> method:<br />

1. Following successful completion of TCA038 there is now just one spare STS-1 on PAR#1-LA#1 trunk<br />

2. Repair fibre PAR#2-LA#2<br />

3. Reserve following capacity between PAR#10 and LA#9 (but do not connect testers)<br />

4. 3 off STS-12c<br />

5. 3 off STS-3c<br />

6. 1 off STS-1<br />

7. Attempt to set up STS-3c circuit from PAR#13-LA#11 – reserve it and put on the traffic<br />

Expected result:<br />

There is 1 spare STS-1 on trunk PAR#1-LA#1 and 2 spare STS-1 between<br />

PAR#10-LA#9. The system should there<strong>for</strong>e be able to set up the STS-3c using<br />

virtual concatenation<br />

PAR#13-LA#11 circuit should be error free<br />

Switch management system should make it clear what is going on<br />

Any other comments:<br />

None<br />

TCA039b: <strong>Test</strong> grooming of STS-1s<br />

Purpose:<br />

To confirm grooming of STS-1s<br />

<strong>Test</strong> method:<br />

1. Start off with Configuration A with no trails configured.<br />

2. Set up following trails from PAR#8-LA#8 :- 1 xSTS-1, 1x STS-3c, 1x STS-12c.<br />

Leave the rest of the STS-1s unequipped<br />

34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!