Other comments:<br />

None<br />

Current route and status.<br />

Main route and Status.<br />

Protection Route and Status.<br />

Available resources.<br />

TCA013: Confirm 1+1 MSP does not revert<br />

Purpose:<br />

To confirm 1+1 MSP is not revertive<br />

<strong>Test</strong> method:<br />

1. Following on from successful completion of TCA012<br />

2. Replace card PAR#6<br />

3. Note results on SDH testers and switch management system<br />

<strong>Test</strong> <strong>Plan</strong> <strong>for</strong> <strong>Optical</strong> <strong>Grooming</strong> <strong>Switches</strong><br />

Expected result:<br />

Card out alarm should be cleared<br />

SDH testers should show no further loss of traffic<br />

Switch management system should still show STS-1 circuit routed via PAR#7-<br />

LON#1 trunk<br />

Other comments:<br />

None<br />

TCA014: Confirm manual switch of 1+1 MSP<br />

Purpose:<br />

To confirm 1+1 MSP can be manually switched correctly<br />

<strong>Test</strong> method:<br />

1. Following on from successful completion of TCA013<br />

2. Manually switch STS-1 circuit from PAR#7-LON#1 trunk to PAR#6-LON#2 trunk<br />

Expected result:<br />

STS-1 circuit should see sub-50 ms loss of traffic<br />

Switch management system should show alarm indicating manual switch<br />

Switch management system should show STS-1 circuit now routed PAR#6-<br />

LON#2<br />

Other comments:<br />

None<br />

TCA015: Confirm loss of protection route on 1+1 MSP is handled correctly<br />

Purpose:<br />

To confirm loss of protection route on 1+1 MSP is handled correctly<br />

<strong>Test</strong> method:<br />

1. Following on from successful completion of TCA014<br />

2. Break fibre PAR#7-LON#1<br />

Expected result:<br />

No loss of traffic on SDH testers<br />

Switch management system shows circuit routings unchanged<br />