06.08.2013 Views

Test Plan for Optical Grooming Switches - Light Reading

Test Plan for Optical Grooming Switches - Light Reading

Test Plan for Optical Grooming Switches - Light Reading

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Test</strong> <strong>Plan</strong> <strong>for</strong> <strong>Optical</strong> <strong>Grooming</strong> <strong>Switches</strong><br />

A SONET/SDH protocol tester to through-mode within main trunk in direction between Port<br />

A and Port B<br />

• Clock from received data.<br />

• Through mode.<br />

• Out of service, transparent.<br />

TCA050: Create protected, revertive trail.<br />

Purpose:<br />

Confirm trail creation<br />

<strong>Test</strong> method:<br />

1. Start off with Configuration A, with no trails configured.<br />

2. Using switch management system, create protected, revertive trail of OC-48 granularity<br />

3. Confirm trail is created and running error free<br />

Expected result:<br />

• SDH testers report error free transmission.<br />

• Switch management reports correct trail creation.<br />

Any other comments:<br />

None<br />

TCA051: Line Span/Multiplex section overhead bytes.<br />

Purpose<br />

Confirm the transparency of the network equipment to Line Span/Multiplex section.<br />

<strong>Test</strong> method:<br />

1. Following on from successful completion of TCA050<br />

2. Using the in-line SONET/SDH <strong>Test</strong>ers, insert an Error rate.<br />

3. Using the SONET/SDH <strong>Test</strong>ers insert a LOS and monitor the K1,K2 from the next node.<br />

Expected result:<br />

• If the switch network is transparent at the Line Span/Multiplex Section level then:<br />

B2 should remain unaltered as B2's are re-calculated at the end of a multiplex<br />

section.<br />

K1, K2 should not be altered by intermediate switch nodes.<br />

Any other comments:<br />

If the system is completely transparent the Line Span/Multiplex section overhead<br />

bytes should not be altered.<br />

TCA052: Section Span/Regenerator Section overhead bytes.<br />

Purpose<br />

Confirming transparency of the network equipment to the Section Span/Regenerator section<br />

<strong>Test</strong> method:<br />

1. Following on from successful completion of TCA051<br />

2. Using the switch management system, check if J0 can be reassigned.<br />

3. Using the in-line SONET/SDH <strong>Test</strong>ers, insert an Error rate.<br />

Expected result:<br />

• If the switch network is transparent at the Section Span/Regenerator Section level<br />

then:<br />

B1 should remain unaltered.<br />

40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!