06.08.2013 Views

Test Plan for Optical Grooming Switches - Light Reading

Test Plan for Optical Grooming Switches - Light Reading

Test Plan for Optical Grooming Switches - Light Reading

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Test</strong> <strong>Plan</strong> <strong>for</strong> <strong>Optical</strong> <strong>Grooming</strong> <strong>Switches</strong><br />

2. At A insert legal Tandem Connection Access Point Identifier (TC-APId) as expected by<br />

B<br />

Expected result:<br />

• No alarms/errors expected.<br />

TCA045: <strong>Test</strong> unexpected Tandem Connection Access Point Identifier.<br />

Purpose:<br />

Confirm action when unexpected TC-APId path trace is received at B.<br />

<strong>Test</strong> method:<br />

1. Set A to “Transparent” and B to terminate the TCM bytes.<br />

2. At A insert different TC-APId to that expected at B.<br />

3. Check <strong>for</strong> TC-APId between A & B using testers in through mode.<br />

Expected result:<br />

• May raise alarm on management system.<br />

• Should receive path AIS (AIS-P / AU-AIS) downstream on tester at B.<br />

• B should terminate the N1 byte with “00h”and raise a remote defect indicator<br />

upstream (TC-RDI) (observed at A).<br />

TCA046: Errors with TCM section.<br />

Purpose:<br />

Confirm TCM operation – Errors with TCM section.<br />

<strong>Test</strong> method:<br />

1. Set A to “Transparent” and B to terminate the TCM bytes.<br />

2. Insert B3 errors at tester No. 1.<br />

Expected result:<br />

• Measure same number of B3s at B.<br />

• Measure RDI & OEI (outgoing error indication) at A from B.<br />

• Management system should indicate errors occurring within the TCM section.<br />

TCA047: Errors external to TCM section.<br />

Purpose:<br />

Confirm TCM operation – Errors external to TCM section.<br />

<strong>Test</strong> method:<br />

1. Set A to “Transparent” and B to terminate the TCM bytes.<br />

2. Insert IEC at tester No. 1(incoming error count) in A.<br />

Expected result:<br />

• Expect to measure same number of B3 errors at B and to record OEI back at A.<br />

• Management system should indicate errors occurring outside the TCM section.<br />

TCA048: TC-AIS external to TCM section.<br />

Purpose:<br />

Confirm TCM operation – AIS external to TCM section.<br />

<strong>Test</strong> method:<br />

1. Set A to “Transparent” and B to terminate the TCM bytes.<br />

2. Insert incoming AIS in the IEC into A using tester No. 1.<br />

38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!