06.08.2013 Views

Test Plan for Optical Grooming Switches - Light Reading

Test Plan for Optical Grooming Switches - Light Reading

Test Plan for Optical Grooming Switches - Light Reading

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

J0 should remain unaltered.<br />

<strong>Test</strong> <strong>Plan</strong> <strong>for</strong> <strong>Optical</strong> <strong>Grooming</strong> <strong>Switches</strong><br />

Any other comments:<br />

If truly transparent system Section Span/Regenerator Section overhead bytes not<br />

should be altered.<br />

TCA053: Automated checks on each byte in the Regenerator and Multiplex section<br />

using test script.<br />

Purpose:<br />

Automated test script to investigate the transparency of the network equipment.<br />

<strong>Test</strong> method:<br />

1. Following on from successful completion of TCA052<br />

2. Run automated test using tool developed by BTexact to check each byte in the Section<br />

Span/Regenerator Section and Line Span/Multiplex Section, except A1, A2, J0, B1, B2,<br />

K1, K2 & H1/H2/H3 pointers 1 , recording the time at which the test was started. The tool<br />

will provide a report to indicate which bytes are sent and received correctly.<br />

Expected result:<br />

For a transparent system the SONET/SDH section overhead will remain unaltered.<br />

For a semi-transparent only a small part of the section overhead shall be processed, as clearly<br />

stated by suppliers equipment documentation.<br />

Any other comments:<br />

1 Cannot use remote control script to test these bytes. A1, A2, J0, K1 & K2 can be tested manually,<br />

separately if required. B1, B2 & AU pointers are automatically generated and so cannot be inserted<br />

arbitrarily, although B1 & B2 error handling are included as separate tests.<br />

END OF BLOCK 9<br />

BLOCK 10. Alarm reporting – including “flapping” alarms<br />

<strong>Test</strong> Block description:<br />

Investigating the ability of the switch management system to accurately and quickly<br />

display network events.<br />

Procedure:<br />

Blocks of tests to proceed in sequence from TCA054 to TC0XX.<br />

<strong>Test</strong> equipment needed:<br />

Four SONET/SDH test sets.<br />

Switch management system.<br />

Optomechanical with automated control.<br />

<strong>Test</strong> equipment placement and set-up:<br />

• Using set-up <strong>for</strong>m previous test block (Transparency of vendors system).<br />

TCA054: measure approximate time interval between breaking path, and GUI reporting<br />

fault and fault cleared.<br />

Purpose<br />

To measure the response time <strong>for</strong> displaying of alarms<br />

<strong>Test</strong> method:<br />

1. Insert optomechanical switch in main working trunk.<br />

41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!