Test Plan for Optical Grooming Switches - Light Reading
Test Plan for Optical Grooming Switches - Light Reading
Test Plan for Optical Grooming Switches - Light Reading
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Figure 1: Flow diagram of testing lifetime.<br />
<strong>Test</strong> Network Configuration<br />
BTexact available/supplied<br />
Infrastructure to supplier<br />
Supplier offer stating equipment and<br />
requirements.<br />
No<br />
Agreement<br />
<strong>Test</strong> <strong>Plan</strong> <strong>for</strong> <strong>Optical</strong> <strong>Grooming</strong> <strong>Switches</strong><br />
The basic configuration consists of 4 nodes named New York, London, Los Angeles, Paris.<br />
Within an operators network it has been traditional to use a single protection scheme over a<br />
plat<strong>for</strong>m, or network tier. It may be advantageous to an operator to use switches to provide<br />
interconnection between networks running different protection schemes. The ability to<br />
support multiple protection schemes on the same switch node may have advantages.<br />
Yes<br />
Equipment documentation provided by<br />
supplier in advance of equipment<br />
Supplier equipment installation and<br />
commissioning.<br />
Supplier test and handover to BTexact<br />
BTexact fixed 10-day testing<br />
period.<br />
Does not include BTexact or<br />
Supplier de-commissioning<br />
and equipment removal<br />
8