06.08.2013 Views

Test Plan for Optical Grooming Switches - Light Reading

Test Plan for Optical Grooming Switches - Light Reading

Test Plan for Optical Grooming Switches - Light Reading

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 1: Flow diagram of testing lifetime.<br />

<strong>Test</strong> Network Configuration<br />

BTexact available/supplied<br />

Infrastructure to supplier<br />

Supplier offer stating equipment and<br />

requirements.<br />

No<br />

Agreement<br />

<strong>Test</strong> <strong>Plan</strong> <strong>for</strong> <strong>Optical</strong> <strong>Grooming</strong> <strong>Switches</strong><br />

The basic configuration consists of 4 nodes named New York, London, Los Angeles, Paris.<br />

Within an operators network it has been traditional to use a single protection scheme over a<br />

plat<strong>for</strong>m, or network tier. It may be advantageous to an operator to use switches to provide<br />

interconnection between networks running different protection schemes. The ability to<br />

support multiple protection schemes on the same switch node may have advantages.<br />

Yes<br />

Equipment documentation provided by<br />

supplier in advance of equipment<br />

Supplier equipment installation and<br />

commissioning.<br />

Supplier test and handover to BTexact<br />

BTexact fixed 10-day testing<br />

period.<br />

Does not include BTexact or<br />

Supplier de-commissioning<br />

and equipment removal<br />

8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!