25.08.2013 Views

Multi Industry Scenarios for Transport - Eurofer

Multi Industry Scenarios for Transport - Eurofer

Multi Industry Scenarios for Transport - Eurofer

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

25<br />

MIST Working Group, version 2001<br />

If EDI is used, this in<strong>for</strong>mation can be transmitted based on the business practice, by using<br />

the messages ORDERS, DELFOR and DELJIT. The choice of the EDIFACT message is<br />

depending on the logistic process or scheduling cycle agreed between the trading parties<br />

involved.<br />

4. Despatch instruction<br />

According to the Call off / delivery instruction received from the consignee, the consignor<br />

shall decide on which goods in the warehouse of the logistic service provider must be<br />

delivered to the consignee. Based on this selection of the goods and the means of transport,<br />

the consignor will <strong>for</strong>ward the despatch instruction to the logistic service provider. This<br />

message allows the logistic service provider to arrange the goods <strong>for</strong> transportation.<br />

For example, “Please load these goods / the goods ordered by this purchase order number on<br />

the truck N, arriving on DD.MM.CCYY and to be delivered to the delivery address Z on date<br />

DD.MM.CCYY.<br />

If EDI is used, this can be done by using one of the messages DESADV, INSDES or<br />

HANMOV. The choice of the message is depending of the logistic process agreed between<br />

the Consignor and the service provider.<br />

Based on the despatch instruction and as responsible arranging the transport to the consignee,<br />

the consignor shall organise the transport as specified in<br />

scenario 2.<br />

5. Despatch confirmation<br />

After the departure of the goods from the logistic service provider, the logistic service<br />

provider will in<strong>for</strong>m the consignor about the goods despatched based on the despatch<br />

instruction.<br />

For example, “we confirm having loaded and despatched the goods as specified in the<br />

despatch instruction, mentioning the departure date and time.”<br />

If EDI is used, this will be done via the DESADV message.<br />

6. Discrepancy report<br />

Occasional stock events<br />

The discrepancy report is send by the logistic service provider to the consignor to in<strong>for</strong>m<br />

about the missing of damaged goods. This in<strong>for</strong>mation can be given when the goods are<br />

received at the logistic service provider or if damage is detected at the service provider or can<br />

be given based on the despatch instruction.<br />

For example, “We have identified the following goods missing, X, Y, Z and the following<br />

goods damaged, N,M, P.<br />

If EDI is used, this will be done via the INVRPT message.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!