25.08.2013 Views

Multi Industry Scenarios for Transport - Eurofer

Multi Industry Scenarios for Transport - Eurofer

Multi Industry Scenarios for Transport - Eurofer

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.3.4. In<strong>for</strong>mation Flow Description<br />

1. <strong>Transport</strong> Booking<br />

Booking of transport services<br />

73<br />

MIST Working Group, version 2001<br />

This is a request from the consignor to the carrier, to book one or more vessels to transport<br />

goods from the consignor (shipping location) to the consignee (receiving location)<br />

specifying the period in which the transport must be done<br />

For example, “Please book send a vessel to be send to Consignor's premises to collect 1000<br />

tonnes between the 5 and 9 October <strong>for</strong> transport to the port of Basel in Switzerland ”<br />

This booking request is normally a firm booking, but if the proposed vessel is not<br />

acceptable, the consignor will issue a new booking requested <strong>for</strong> another vessel.<br />

If EDI is used, this will be done by the message IFTMBF (IFTMBP) or IFCSUM.<br />

N.B. For inland waterway transport a transport booking relates always to a complete<br />

vessel and not to a certain space.<br />

2. Confirmation of the transport booking<br />

After reception of the transport booking, the <strong>for</strong>warder/carrier has a certain period<br />

(stipulated in the contract) to nominated one or more vessels to carry the goods.<br />

As a response to the transport booking the carrier will in<strong>for</strong>m the consignor, by given the<br />

name of the vessel(s), the gross weight of the vessel, and the estimated arrival time at the<br />

consignor’s place of loading.<br />

If EDI is used, this will be done by the message IFTMBC or IFCSUM.<br />

Remark : If the proposed vessel(s) is not accepted by the consignor, the<br />

consignor will issue a new booking request and in<strong>for</strong>ming that<br />

the nominated vessel(s) are not accepted.<br />

Despatch of goods<br />

The transport label should be attached to the goods at the latest at this moment.<br />

3. Goods collected by Carrier and Documents issued<br />

Here we have assumed that the Consignor will produce the relevant documentation needed<br />

<strong>for</strong> the transport of the goods to the consignee.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!