PBM2 Chapter 4 14(21)<br />

4.9 Qualification <strong>of</strong> personnel<br />

Qualification <strong>of</strong> personnel requires the existence <strong>of</strong> a qualified procedure and<br />

equipment. Practical trials <strong>for</strong> personnel <strong>qualification</strong> are normally carried out on bl<strong>in</strong>d<br />

test pieces. The <strong>qualification</strong> can apply separately to detection, characterisation, siz<strong>in</strong>g,<br />

or all parts together. The <strong>qualification</strong> can also be separated <strong>in</strong>to four steps; data<br />

collection, detection, characterisation and siz<strong>in</strong>g. A <strong>qualification</strong> <strong>for</strong> an <strong>in</strong>dividual can<br />

comprise <strong>of</strong> one or more <strong>of</strong> these steps.<br />

In the case <strong>of</strong> <strong>qualification</strong> <strong>for</strong> manual <strong>in</strong>spection all steps may be <strong>in</strong>cluded together or<br />

separately. In the case <strong>of</strong> <strong>qualification</strong> <strong>for</strong> mechanised <strong>in</strong>spection which is carried out<br />

by an <strong>in</strong>spection team, the tasks which require <strong>qualification</strong> shall be def<strong>in</strong>ed and the<br />

requirements <strong>for</strong> each such task shall be specified. Each <strong>in</strong>dividual shall be qualified<br />

<strong>for</strong> one or more <strong>of</strong> the specified tasks.<br />

Personnel who are to be qualified <strong>for</strong> evaluation shall be certified <strong>for</strong> at least Level 2<br />

accord<strong>in</strong>g to Nordtest Doc Gen 010, SS-EN 473/Nordtest, or other national standard<br />

with correspond<strong>in</strong>g requirements. For other tasks <strong>in</strong> mechanised <strong>in</strong>spection, an<br />

assessment shall be made regard<strong>in</strong>g necessary basic personnel tra<strong>in</strong><strong>in</strong>g.<br />

4.10 System <strong>qualification</strong><br />

Equipment, procedure and personnel <strong>qualification</strong>s <strong>for</strong> one and the same <strong>in</strong>spection<br />

system may be qualified together and then constitutes a system <strong>qualification</strong>. If any part<br />

<strong>of</strong> the system is changed a new assessment <strong>of</strong> the whole <strong>in</strong>spection system must be<br />

carried out.<br />

4.11 Assessment<br />

Assessment <strong>of</strong> the practical trials shall be carried out accord<strong>in</strong>g to applicable<br />

<strong>in</strong>structions. For procedure <strong>qualification</strong>, this assessment together with the assessment<br />

<strong>of</strong> the technical justification make up the total assessment <strong>of</strong> the reliability <strong>of</strong> the<br />

procedure. For personnel <strong>qualification</strong> the pass/fail criteria shall be known to those<br />

be<strong>in</strong>g tested.<br />

4.12 Re<strong>qualification</strong><br />

Re<strong>qualification</strong> can become necessary <strong>for</strong> two reasons. AL or <strong>in</strong>volved staff may either<br />

have failed the <strong>qualification</strong>, or changes <strong>in</strong> equipment, procedure, personnel or other<br />

prerequisites may call <strong>for</strong> an amendment <strong>of</strong> the <strong>qualification</strong>.<br />

Edition: 4<br />

In the case <strong>of</strong> re<strong>qualification</strong> because <strong>of</strong> a failure, the customer (Licensee and/or AL)<br />

shall first show that appropriate measures have been taken to rectify the deficiencies<br />

which caused the failure. In the case <strong>of</strong> re<strong>qualification</strong>/amendment because <strong>of</strong> changes,<br />

the orig<strong>in</strong>al <strong>qualification</strong> procedure is followed <strong>in</strong> relevant parts.