26.12.2013 Views

Report - Oregon State Library: State Employee Information Center ...

Report - Oregon State Library: State Employee Information Center ...

Report - Oregon State Library: State Employee Information Center ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Liquefaction Mitigation Procedure<br />

Geo/Hydro Section evaluates<br />

liquefaction and approach fill<br />

deformation potential (lateral<br />

displacements and settlement)<br />

Typical Design No Large embankment<br />

STEP I<br />

deformation potential?<br />

Yes<br />

Foundation and Structural Designers<br />

determine damage potential to structure.<br />

STEP II<br />

Typical Design<br />

No<br />

Significant potential for damage to<br />

bridge?<br />

Yes<br />

STEP III<br />

Is structure located on a designated<br />

“Lifeline” route?<br />

Yes<br />

Yes<br />

No<br />

OTHER CRITERIA (for consideration)<br />

Document liquefaction &<br />

lateral spread damage<br />

potential and perform<br />

typical design<br />

No<br />

No<br />

ADT on or under bridge<br />

Economic Recovery Route<br />

Ratio of mitigation cost/current structure replacement<br />

cost<br />

Current bridge replacement cost<br />

Yes<br />

Does Structure Qualify for<br />

Mitigation?<br />

(Bridge Section Decision)<br />

Proceed with<br />

Mitigation Design<br />

STEP IV<br />

Figure 1.1: ODOT’s Liquefaction Mitigation Procedure<br />

4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!