SESSION OF <strong>2004</strong> <strong>Act</strong> <strong>2004</strong>-40 267<br />

(J) Additional funds for DGS 1103-69, ventilation<br />

fume hood upgrade, Chevron Science Center 2,500,000<br />

(K) University <strong>of</strong> Pittsburgh Medical Center -<br />

Braddock, construction and renovations for<br />

hospital expansion project 2,975,000<br />

(v) Scranton School for the Deaf<br />

(A) Cabling infrastructure improvement 132,000<br />

(Base <strong>Project</strong> Allocation - $115,000)<br />

(Design and Contingencies - $17,000)<br />

(B) Campus safety improvements 121,000<br />

(Base <strong>Project</strong> Allocation - $105,000)<br />

(Design and Contingencies - $16,000)<br />

(C) Campus paving project 302,000<br />

(Base <strong>Project</strong> Allocation - $263,000)<br />

(Design and Contingencies - $39,000)<br />

(D) Cabling infrastructure improvement 137,000<br />

(Base <strong>Project</strong> Allocation - $123,000)<br />

(Design and Contingencies - $14,000)<br />

(E) Campus safety improvements 5,100,000<br />

(Base <strong>Project</strong> Allocation - $4,250,000)<br />

(Design and Contingencies - $850,000)<br />

(vi) Thaddeus Stevens College <strong>of</strong> Technology<br />

(A) Renovate Mellor Building 7,000,000<br />

(Base <strong>Project</strong> Allocation - $5,800,000)<br />

(Design and Contingencies - $1,200,000)<br />

(B) Asbestos removal 723,000<br />

(Base <strong>Project</strong> Allocation - $651,000)<br />

(Design and Contingencies - $72,000)<br />

(C) Expand dining hall and kitchen 5,750,000<br />

(Base <strong>Project</strong> Allocation - $5,000,000)<br />

(Design and Contingencies - $750,000)<br />

(D) Construct second floor to the Hartzell Building 3,200,000<br />

(Base <strong>Project</strong> Allocation - $2,000,000)<br />

(Design and Contingencies - $1,200,000)<br />

(E) Expand Vocational Education Building 750,000<br />

(Base <strong>Project</strong> Allocation - $675,000)<br />

(Design and Contingencies - $75,000)<br />

(vii) Temple University<br />

(A) Fire safety project, Phase III sprinlder<br />

installation 5,048,000<br />

(B) Paley Library renovation and expansion 60,000,000<br />

(C) Renovation <strong>of</strong> existing facilities to consolidate<br />

instructional spaces for Tyler Main Campus pro-