SESSION OF <strong>2004</strong> <strong>Act</strong> <strong>2004</strong>-40 301<br />

(x) FFY <strong>2003</strong>-<strong>2004</strong> infrastructure safety renewal<br />

program 15,000,000<br />

(Base <strong>Project</strong> Allocation - $13,500,000)<br />

(Design and Contingencies - $1,500,000)<br />

(xi) FFY 2006-2007 flex funds program 1,350,000<br />

(Base <strong>Project</strong> Allocation - $1,215,000)<br />

(Design and Contingencies - $135,000)<br />

(xii) FFY 2006-2007 infrastructure safety renewal<br />

program 17,000,000<br />

(Base <strong>Project</strong> Allocation - $15,300,000)<br />

(Design and Contingencies - $1,700,000)<br />

(xiii) FFY 2006-2007 vehicle overhaul 3,000,000<br />

(xiv) Major rehabilitation <strong>of</strong> 15 light rail vehicles 4,832,000<br />

(xv) Construction <strong>of</strong> East Busway from Swissvale to<br />

Turtle Creek connecting at the Tn Boro Expressway 20,000,000<br />

(xvi) North Shore connector project, including<br />

expansion <strong>of</strong> the LRT to the northside, an extension<br />

<strong>of</strong> the Convention Center and an intermodal<br />

transportation center 43,600,000<br />

(Base <strong>Project</strong> Allocation - $39,240,000)<br />

(Design and Contingencies - $4,360,000)<br />

(xvii) Federal Fiscal Year <strong>2004</strong> bus procurement 10,000,000<br />

(Base <strong>Project</strong> Allocation - $9,000,000)<br />

(Design and Contingencies - $1,000,000)<br />

(8) Pottstown Urban Transit<br />

(i) Acquisition <strong>of</strong> two new buses 600,000<br />

(8.1) Red Rose Transit Authority<br />

(i) Construction<strong>of</strong> Paradise rail station 458,000<br />

(Base <strong>Project</strong> Allocation - $412,000)<br />

(Design and Contingencies - $46,000)<br />

(ii) Replacement <strong>of</strong> 15 buses 750,000<br />

(Base <strong>Project</strong> Allocation - $675,000)<br />

(Design and Contingencies - $75,000)<br />

(iii) Operations center renovations and expansion 250,000<br />

(Base <strong>Project</strong> Allocation - $225,000)<br />

(Design and Contingencies - $25,000)<br />

(9) Schuylkill Transportation System<br />

(i) Design and construction <strong>of</strong> a new intermodal<br />

complex in downtown Pottsville 4,000,000<br />

(10) Southeastern Pennsylvania Transportation Authority<br />

(i) FFY 2000 Section 5309 fixed-guideway program 10,413,000<br />

(Base <strong>Project</strong> Allocation - $9,372,000)<br />

(Design and Contingencies - $1,041,000)<br />

(ii) FFY <strong>2003</strong> safetyand security program 5,208,000<br />

(Base <strong>Project</strong> Allocation - $4,687,000)<br />

(Design and Contingencies - $521,000)