SESSION OF <strong>2004</strong> <strong>Act</strong> <strong>2004</strong>-40 315<br />
Rehabilitation will include, but not be limited to, ties,<br />
switch timbers, track upgrade, track infrastructure<br />
materials, grading, drainage and other associated<br />
improvements. 867,000<br />
(ii) Rehabilitation <strong>of</strong> 5.5 miles <strong>of</strong> existing track from<br />
Houston to the end <strong>of</strong> the line at Arden on the Arden<br />
Branch (mileposts 14.85 to 20.35) for the hauling <strong>of</strong><br />
rail freight traffic. Rehabilitation will include, but not<br />
be limited to, ties, switch timbers, track upgrade,<br />
track infrastructure materials, grading, drainage and<br />
other associated improvements. 834,000<br />
(31) Fayette County<br />
(i) Fayette Rail <strong>Project</strong>, building and trackconstruction<br />
and renovation for passenger service 750,000<br />
(32) Westmoreland County<br />
(i) City <strong>of</strong> Monessen<br />
(A) Monessen Riverfront Industrial Park, construct<br />
new rail spur, including switches, signals, ties,<br />
ballast, rail and other related railroad construction<br />
materials, from CSX and Wheeling and Lake Erie<br />
rail lines to serve the new Maronda, Inc., facility 550,000<br />
(B) Monessen Riverfront Industrial Park, reconstruct<br />
12th Street rail crossing to service CSX and<br />
Wheeling and Lake Erie Lines to serve the<br />
industrial park 450,000<br />
(33) Lackawanna County<br />
(i) Extension <strong>of</strong> Lackawanna County rail authority line<br />
in Dunmore 3,500,000<br />
(34) Clarion and Jefferson Counties<br />
(i) RFI Energy<br />
(A) Rehabilitation <strong>of</strong> 48 miles <strong>of</strong> rail line, install<br />
crossties, raise line and surface, Laurel<br />
subdivision and Sligo branch, including Shannon<br />
Coal Yard 2,000,000<br />
(35) United States Steel Corporation, Clairton Works<br />
(i) Rehabilitation and replacement <strong>of</strong> rail infrastructure<br />
to maintain capacity and operating capability,<br />
including replacement <strong>of</strong> deteriorating ballast, rail,<br />
ties, switches and turnouts and the reconstruction <strong>of</strong><br />
culverts and ditches. Enhance existing bridges and<br />
load out tracks to accommodate heavier cars,<br />
increased loading frequency and upgrade rail rating<br />
from 115 pounds to 136 pounds. 5,020,000<br />
(Base <strong>Project</strong> Allocation - $5,000,000)<br />
(Design and Contingencies - $20,000)<br />
(36) Warren County