SESSION OF <strong>2004</strong> <strong>Act</strong> <strong>2004</strong>-40 315<br />

Rehabilitation will include, but not be limited to, ties,<br />

switch timbers, track upgrade, track infrastructure<br />

materials, grading, drainage and other associated<br />

improvements. 867,000<br />

(ii) Rehabilitation <strong>of</strong> 5.5 miles <strong>of</strong> existing track from<br />

Houston to the end <strong>of</strong> the line at Arden on the Arden<br />

Branch (mileposts 14.85 to 20.35) for the hauling <strong>of</strong><br />

rail freight traffic. Rehabilitation will include, but not<br />

be limited to, ties, switch timbers, track upgrade,<br />

track infrastructure materials, grading, drainage and<br />

other associated improvements. 834,000<br />

(31) Fayette County<br />

(i) Fayette Rail <strong>Project</strong>, building and trackconstruction<br />

and renovation for passenger service 750,000<br />

(32) Westmoreland County<br />

(i) City <strong>of</strong> Monessen<br />

(A) Monessen Riverfront Industrial Park, construct<br />

new rail spur, including switches, signals, ties,<br />

ballast, rail and other related railroad construction<br />

materials, from CSX and Wheeling and Lake Erie<br />

rail lines to serve the new Maronda, Inc., facility 550,000<br />

(B) Monessen Riverfront Industrial Park, reconstruct<br />

12th Street rail crossing to service CSX and<br />

Wheeling and Lake Erie Lines to serve the<br />

industrial park 450,000<br />

(33) Lackawanna County<br />

(i) Extension <strong>of</strong> Lackawanna County rail authority line<br />

in Dunmore 3,500,000<br />

(34) Clarion and Jefferson Counties<br />

(i) RFI Energy<br />

(A) Rehabilitation <strong>of</strong> 48 miles <strong>of</strong> rail line, install<br />

crossties, raise line and surface, Laurel<br />

subdivision and Sligo branch, including Shannon<br />

Coal Yard 2,000,000<br />

(35) United States Steel Corporation, Clairton Works<br />

(i) Rehabilitation and replacement <strong>of</strong> rail infrastructure<br />

to maintain capacity and operating capability,<br />

including replacement <strong>of</strong> deteriorating ballast, rail,<br />

ties, switches and turnouts and the reconstruction <strong>of</strong><br />

culverts and ditches. Enhance existing bridges and<br />

load out tracks to accommodate heavier cars,<br />

increased loading frequency and upgrade rail rating<br />

from 115 pounds to 136 pounds. 5,020,000<br />

(Base <strong>Project</strong> Allocation - $5,000,000)<br />

(Design and Contingencies - $20,000)<br />

(36) Warren County