276 <strong>Act</strong> <strong>2004</strong>-40 LAWS OF PENNSYLVANIA<br />
(A) Acquisition and installation <strong>of</strong> power equipment<br />
for the Pennsylvania Public Television Network to<br />
support the National Emergency Alert System and<br />
PEMA’s delivery <strong>of</strong> data to secondary and tertiary<br />
emergency services 4,000,000<br />
(7) Department <strong>of</strong> Environmental Protection<br />
(i) Allegheny County<br />
(A) Additional funds for DGS project 183-15,<br />
McKeesport flood protection 1,200,000<br />
(Base <strong>Project</strong> Allocation - $1,000,000)<br />
(Design and Contingencies - $200,000)<br />
(B) Logan Run Creek flood mitigation, storm water<br />
retention and flood control measures associated<br />
with the tributary <strong>of</strong> Piney Fork adjacent to Logan<br />
Road in Bethel Park Borough 1,700,000<br />
(Base <strong>Project</strong> Allocation - $1,000,000)<br />
(Land Allocation - $500,000)<br />
(Design and Contingencies - $200,000)<br />
(C) Hannony Road tributary, flood control project<br />
including stream bank stabilization and storm<br />
water management measures in association with<br />
the Ohio River tributary in Ohio and Kilibuck<br />
Townships 800,000<br />
(Base <strong>Project</strong> Allocation - $650,000)<br />
(Design and Contingencies - $150,000)<br />
(D) Flood control and storm water management<br />
project associated with the tributary <strong>of</strong> Painters<br />
Run along Cedar Road at intersection <strong>of</strong><br />
Greenhurst Road in Mt. Lebanon Township 300,000<br />
(Base <strong>Project</strong> Allocation - $200,000)<br />
(Land Allocation - $65,000)<br />
(Design and Contingencies - $35,000)<br />
(E) Flood control, stream bank stabilization and<br />
storm water management project associated with<br />
the tributary <strong>of</strong> Bear Run along Crawford Road in<br />
Ohio Township 0 500,000<br />
(Base <strong>Project</strong> Allocation - $400,000)<br />
(Design and Contingencies - $100,000)<br />
(F) Flood control and storm water retention project<br />
associated with tributary <strong>of</strong> BrushRun adjacent to<br />
Hays and Underwood in Upper St. Clair Township 200,000<br />
(Base <strong>Project</strong> Allocation - $150,000)<br />
(Land Allocation - $25,000)<br />
(Design and Contingencies - $25,000)