276 <strong>Act</strong> <strong>2004</strong>-40 LAWS OF PENNSYLVANIA<br />

(A) Acquisition and installation <strong>of</strong> power equipment<br />

for the Pennsylvania Public Television Network to<br />

support the National Emergency Alert System and<br />

PEMA’s delivery <strong>of</strong> data to secondary and tertiary<br />

emergency services 4,000,000<br />

(7) Department <strong>of</strong> Environmental Protection<br />

(i) Allegheny County<br />

(A) Additional funds for DGS project 183-15,<br />

McKeesport flood protection 1,200,000<br />

(Base <strong>Project</strong> Allocation - $1,000,000)<br />

(Design and Contingencies - $200,000)<br />

(B) Logan Run Creek flood mitigation, storm water<br />

retention and flood control measures associated<br />

with the tributary <strong>of</strong> Piney Fork adjacent to Logan<br />

Road in Bethel Park Borough 1,700,000<br />

(Base <strong>Project</strong> Allocation - $1,000,000)<br />

(Land Allocation - $500,000)<br />

(Design and Contingencies - $200,000)<br />

(C) Hannony Road tributary, flood control project<br />

including stream bank stabilization and storm<br />

water management measures in association with<br />

the Ohio River tributary in Ohio and Kilibuck<br />

Townships 800,000<br />

(Base <strong>Project</strong> Allocation - $650,000)<br />

(Design and Contingencies - $150,000)<br />

(D) Flood control and storm water management<br />

project associated with the tributary <strong>of</strong> Painters<br />

Run along Cedar Road at intersection <strong>of</strong><br />

Greenhurst Road in Mt. Lebanon Township 300,000<br />

(Base <strong>Project</strong> Allocation - $200,000)<br />

(Land Allocation - $65,000)<br />

(Design and Contingencies - $35,000)<br />

(E) Flood control, stream bank stabilization and<br />

storm water management project associated with<br />

the tributary <strong>of</strong> Bear Run along Crawford Road in<br />

Ohio Township 0 500,000<br />

(Base <strong>Project</strong> Allocation - $400,000)<br />

(Design and Contingencies - $100,000)<br />

(F) Flood control and storm water retention project<br />

associated with tributary <strong>of</strong> BrushRun adjacent to<br />

Hays and Underwood in Upper St. Clair Township 200,000<br />

(Base <strong>Project</strong> Allocation - $150,000)<br />

(Land Allocation - $25,000)<br />

(Design and Contingencies - $25,000)