Capital Budget Project Itemization Act of 2003-2004
Capital Budget Project Itemization Act of 2003-2004
Capital Budget Project Itemization Act of 2003-2004
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
SESSION OF <strong>2004</strong> <strong>Act</strong> <strong>2004</strong>-40 317<br />
earth work, engineering and any other costs<br />
associated with this project. 13,500,000<br />
(Base <strong>Project</strong> Allocation - $11,430,000)<br />
(Land Allocation - $250,000)<br />
(Design and Contingencies - $1,820,000)<br />
(41) Resource Recovery LLC - Clearfield County and<br />
Centre County<br />
(i). Rehabilitation and replacement <strong>of</strong> 17 miles <strong>of</strong> rail<br />
trackage to begin rail shipments, including<br />
replacement <strong>of</strong> deteriorating and/or missing ballast,<br />
rails, ties, switches and turnouts and the construction<br />
<strong>of</strong> a bridge, culverts and ditches 8,500,000<br />
(c) Air transportation.—Additional capital projects in the category <strong>of</strong><br />
transportation assistance projects for air transportation service to which an<br />
interest is to be acquired by the Department <strong>of</strong> Transportation, its successors<br />
or assigns and to be financed by the incurring <strong>of</strong> debt are hereby itemized,<br />
together with their respective estimated financial costs, as follows:<br />
Total<br />
<strong>Project</strong><br />
<strong>Project</strong><br />
Allocation<br />
(1) Allegheny County<br />
(i) Pittsburgh International Airport<br />
(A) Environmental impact studies and preliminary<br />
engineering 10,000,000<br />
(B) Construction <strong>of</strong> maintenance and repair facility<br />
and improve and/or upgrade existing facilities 50,000,000<br />
(1.1) Beaver County<br />
(i) Zelienople Airport<br />
(A) Construction <strong>of</strong> T-hangars 108,000<br />
(B) Construction <strong>of</strong> airport access road 275,000<br />
(1.2) Bedford County<br />
(i) Bedford County Air Industrial Park Authority<br />
(A) Acquisition <strong>of</strong> snow removal equipment 115,000<br />
(B) Expansion <strong>of</strong> FBO public parking 40,000<br />
(C) Land acquisition for runway obstruction removal 650,000<br />
(D) Conduct archeological study 100,000<br />
(E) Conductenvironmental assessment 200,000<br />
(1.3) Blair County<br />
(i) Blair County Airport Authority<br />
(A) Construction <strong>of</strong> two T-hangar units 750,000<br />
(1.4) Bradford County<br />
(i) Bradford County Airport<br />
(A) Construction <strong>of</strong> corporate hangars 250,000<br />
(B) Construction <strong>of</strong>T-hangars 150,000<br />
(2) Bucks County<br />
(i) Doylestown Airport