306 <strong>Act</strong> <strong>2004</strong>-40 LAWS OF PENNSYLVAMA<br />
(Design and Contingencies - $100,000)<br />
(iii) Rehabilitation and infrastructure improvements to<br />
the Buffalo and Pittsburgh Railroad and DuBois<br />
Yard for a new transload facility, including the<br />
replacement <strong>of</strong> rails, ties, ballast, surface, switch,<br />
road crossings, bridge and other rail-related<br />
infrastructure 2,200,000<br />
(Base <strong>Project</strong> Allocation - $2,000,000)<br />
(Design and Contingencies - $200,000)<br />
(iv) Rehabilitate the Buffalo and Pittsburgh railroad<br />
from Eidenau to New Castle, including the<br />
replacement <strong>of</strong> rails, ties, ballast, surface, switch,<br />
roadcrossings, bridge and other rail-related<br />
infrastructure 6,640,000<br />
(Base <strong>Project</strong> Allocation - $6,000,000)<br />
(Design and Contingencies - $640,000)<br />
(v) Replace selected rail and railroad ties on various<br />
curves and replace various switches and signals to<br />
handle additional stress and weight between<br />
Punxsutawney and Bradford 2,750,000<br />
(Base <strong>Project</strong> Allocation - $2,500,000)<br />
(Design and Contingencies - $250,000)<br />
(vi) Rehabilitation <strong>of</strong> main line track to restore service<br />
from Creekside to Homer City, Indiana County,<br />
including ties, rail, surface, bridge switches, road<br />
crossings, signal, communication and any other<br />
related work 2,800,000<br />
(Base <strong>Project</strong> Allocation - $2,520,000)<br />
(Design and Contingencies - $280,000)<br />
(vii) Rehabilitation <strong>of</strong> 12 bridges and replacement <strong>of</strong><br />
three bridges on the Buffalo and Pittsburgh line to<br />
Petrolia in Butler County 600,000<br />
(Base <strong>Project</strong> Allocation - $600,000)<br />
(viii) Phase 2 <strong>of</strong> the rehabilitation project to upgrade an<br />
additional 24 miles <strong>of</strong> track to Homer City 8,400,000<br />
(Base <strong>Project</strong> Allocation - $7,560,000)<br />
(Design and Contingencies - $840,000)<br />
(ix) Allegheny River bridge project 1,325,000<br />
(Base <strong>Project</strong> Allocation - $1,193,000)<br />
(Design and Contingencies - $132,000)<br />
(x) Beaver County rail rehabilitation project 3,000,000<br />
(Base <strong>Project</strong> Allocation - $2,700,000)<br />
(Design and Contingencies - $300,000)<br />
(xi) Northern subdivision rail rehabilitation project 3,000,000<br />
(Base <strong>Project</strong> Allocation - $2,700,000)<br />
(Design and Contingencies - $300,000)