Achievement Definitions<br />

Our achievement of each performance target is assessed consistently using the following definitions:<br />

Performance<br />

Target Result<br />

Achieved<br />

Substantially<br />

Achieved<br />

Achieved in<br />

Part<br />

On Track<br />

Not Achieved<br />

Not Formally<br />

Measured<br />

Not Applicable<br />

Definition<br />

All aspects of the performance target were achieved, including time, cost, quality,<br />

and location, as relevant.<br />

The activity identified in the performance target was carried out, but there were<br />

minor slippages in time and / or costs. These slippages were slightly higher than<br />

budgeted, but no more than 5%.<br />

The planned activity was carried out, but the time components of the performance<br />

target were not met and / or expenditure was more than 5% over budget.<br />

The measure has a target set outside the reporting period, or covering multiple<br />

reporting periods. As a result, no conclusive assessment of actual achievement<br />

can be made, but the activity is tracking appropriately at present.<br />

The activity was not significantly progressed or the work undertaken did not meet<br />

the requirements of the target.<br />

Performance could not be conclusively reported on (for example, the necessary<br />

systems were not in place to measure performance or the data collected was not<br />

statistically reliable).<br />

Due to events beyond the <strong>Council</strong>'s control, the activity was no longer relevant and<br />

the work was not carried out.<br />

Service Performance Results<br />

ACTIVITIES<br />

This section of the report describes the main activities that <strong>Council</strong> proposes for 2012/13. The<br />

activities are arranged under <strong>Council</strong>'s eleven Groups of Activities, as outlined in the Long-Term Plan<br />

2012-22 (LTP), which are:<br />

. Community Services<br />

. Water<br />

. Transport<br />

. Lakes, Rivers and Mountains<br />

. Community Facilities<br />

. Wastewater<br />

Solid Waste<br />

. Stormwater<br />

Democracy and Planning<br />

Investments, and<br />

. Economic Development.