2013-05-28-council-agenda - Taupo District Council
2013-05-28-council-agenda - Taupo District Council
2013-05-28-council-agenda - Taupo District Council
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1^<br />
Wastewater<br />
What we do<br />
<strong>Council</strong> collects, treats and disposes of wastewater from residential, commercial and industrial<br />
properties within designated drainage areas of the <strong>District</strong>, safeguarding the environment and<br />
protecting public health. We provide sufficient capacity to serve communities within current<br />
designated drainage areas of the <strong>District</strong>, on a continuous basis, and we treat and dispose of<br />
wastewater in an environmentally responsible way, meeting WRC consent conditions, including odour<br />
control at our treatment facilities.<br />
Our services support our environment outcome: a shared responsibility for places we are proud of.<br />
What we plan for 2012/13<br />
Key actions, projects and services Complete On Track Will not<br />
complete<br />
Develop a new facility for fats, oils and grease from<br />
grease traps in the <strong>Taupo</strong> CBD (investigation only).<br />
Investigate options for connecting Hirangi Road<br />
residents to the wastewater network.<br />
Identify the volume of stormwater infiltratlon to the<br />
Mangakino sewerage system.<br />
* Investigations have commenced.<br />
" Construction is complete.<br />
How we'll know we're on track<br />
What we want to know Measure Target Response<br />
We provide safe, efficient<br />
wastewater services that<br />
protect public health and<br />
property without<br />
compromising our<br />
waterways, to the<br />
satisfaction of service<br />
users.<br />
No wastewater<br />
overflows to<br />
lakes, rivers or<br />
streams.<br />
Achieve<br />
Not Achieved<br />
2 incidents of sewerage spill<br />
into the lake occurred in the<br />
last 3 quarters of the year.<br />
' Sewer rising main break<br />
occurred at Matuku St.<br />
Pump Station on the 25 of<br />
Dec 2012.<br />
Sewerage overflow from a<br />
sewer manhole opposite <strong>28</strong>2<br />
Lake Terrace on the 9 of<br />
Feb <strong>2013</strong>.<br />
Compliance with<br />
all resource<br />
consent<br />
conditions.<br />
Achieve<br />
Not Achieved.<br />
There are compliance issues<br />
at Kinloch, Waitahanui and<br />
Turangi wastewater treatment<br />
plants on the concentration of<br />
nitrogen in discharged<br />
effluent. These noncompliances<br />
are due to a<br />
number of on-going<br />
operational issues. Work is ongoing<br />
to resolve these issues.<br />
22