ALUMINIUM RoLLINg INDUSTRY<br />

Ort für ihre große Kooperationsbereitschaft<br />

während <strong>de</strong>r Montage und Inbetriebnahme.<br />

Great job!“, so Yuan Bisheng, Project Manager<br />

bei Kunshan.<br />

Die exzellente Zusammenarbeit wird auch<br />

seitens Achenbach gelobt: „Das professionelle<br />

Projektmanagement von KunShan <strong>Alu</strong>minium<br />

in diesem ehrgeizigen Projekt hat eine<br />

nahezu reibungslose Abwicklung möglich gemacht:<br />

Die Baustelle war für <strong>de</strong>n Start <strong>de</strong>r Vor-<br />

Ort-Montage perfekt vorbereitet, die Zuverlässigkeit<br />

<strong>de</strong>s Kun<strong>de</strong>n während <strong>de</strong>r Montage<br />

und Inbetriebnahme hoch, und kleinere Engpässe,<br />

die es auf einer Baustelle nun einmal<br />

immer mal wie<strong>de</strong>r gibt, wur<strong>de</strong>n stets unbürokratisch<br />

und schnell gemeinsam behoben“, so<br />

beschreiben Jörg-Michael Hey als Chef <strong>de</strong>r<br />

Auftragsabwicklung und Daniela Posselt als<br />

Projektmanagerin die Zusammenarbeit.<br />

Montage- und Inbetriebnahme-Team unterstreichen<br />

ihrerseits die große Hilfsbereitschaft<br />

<strong>de</strong>r KunShan-Mitarbeiter: „Dies war eine angenehme<br />

Baustelle, die richtig Spaß gemacht<br />

hat.“ Und Wilhelm-Friedrich Sommer, gesamtverantwortlich<br />

für <strong>de</strong>n technischen Vertrieb,<br />

betont: „Mit diesem Projekt wur<strong>de</strong>n die<br />

guten Geschäftsbeziehungen zwischen Kun-<br />

Shan <strong>Alu</strong>minium und Achenbach Buschhütten<br />

ein weiteres Mal bestätigt. Wir freuen uns,<br />

mit KunShan <strong>Alu</strong>minium einen Premium-<br />

Folienproduzenten als Kun<strong>de</strong>n zu haben, <strong>de</strong>r<br />

sich mit technischen Ehrgeiz und Begeisterung<br />

für mo<strong>de</strong>rne Technologie für Achenbach als<br />

Anlagenlieferanten entschie<strong>de</strong>n hat. Wir wür<strong>de</strong>n<br />

uns sehr freuen, wenn wir ihm auch in<br />

Zukunft in Anlagenservice und Anlagenausbau<br />

zur Seite stehen dürfen.“<br />

n<br />

The Royal Mint: Siemens VAI implements optimal<br />

upgra<strong>de</strong> path for the legacy automatic gauge control<br />

M. Chatterton, Siemens VAI<br />

The roots of Siemens VAI as it stands today,<br />

as part of Siemens Plc’s Industry Sector, lead<br />

back to the Davy business who, during the<br />

1980s and 1990s installed many Automatic<br />

Gauge Control (<strong>AG</strong>C) / Automatic Flatness<br />

Control (AFC) systems on cold mills using<br />

their System 2, 21 and KS2100 platforms.<br />

With advances in technology, support for<br />

these platforms is no longer guaranteed due<br />

to equipment obsolescence. As such producers<br />

are reliant on in-house spares and know-how<br />

to maintain the systems, and are therefore<br />

susceptible to excessive downtime if a breakdown<br />

occurs in these systems.<br />

Stuart North, project manager at Siemens<br />

VAI, comments: “This was the situation facing<br />

the Royal Mint on their single stand cold<br />

reversing mill at Llantrisant, Wales. Davy Mc-<br />

Kee had installed a System 21 <strong>AG</strong>C on the mill<br />

in the mid-1990s and had continued support of<br />

the system through a service contract with Siemens.<br />

After a significant breakdown in 2011,<br />

it was evi<strong>de</strong>nt to both The Royal Mint and Siemens<br />

that the system had to be replaced.”<br />

According to Stuart, the objectives of the<br />

upgra<strong>de</strong> project were to<br />

• replace the existing System 21 automatic<br />

gauge system and main DC drives (mill,<br />

coiler, un-coiler) with a cost effective<br />

solution which would minimise downtime<br />

• i<strong>de</strong>ntify any other major components<br />

which should be replaced either due to<br />

obsolescence or to provi<strong>de</strong> either<br />

improved performance or an optimum<br />

solution<br />

• obtain at least the equivalent thickness<br />

tolerances as achieved with the existing<br />

System 21<br />

• <strong>de</strong>liver the equipment within nine<br />

months and install and start-up the mill<br />

within a 10 day shutdown.<br />

The new <strong>AG</strong>C system was based on the latest<br />

Siemens VAI Siroll <strong>Alu</strong> TCS which is based<br />

on the Siroll suite of software and system solutions.<br />

The hardware backbone is the high<br />

performance Simatic TDC system.<br />

The system inclu<strong>de</strong>s all the features typically<br />

nee<strong>de</strong>d for a cold mill application to optimise<br />

the rolling operation:<br />

• <strong>AG</strong>C for narrow strip thickness tolerances<br />

• Stand controls for closed loop control of<br />

the mill actuators<br />

• Intelligent pass schedule editor and storage<br />

© Siemens<br />

Siroll <strong>Alu</strong> TCS Cabinet<br />

Siroll <strong>Alu</strong> TCS – pass scheduling editor and storage<br />

32 ALUMINIUM · 11/2013