ALUMINIUM RoLLINg INDUSTRY<br />
Ort für ihre große Kooperationsbereitschaft<br />
während <strong>de</strong>r Montage und Inbetriebnahme.<br />
Great job!“, so Yuan Bisheng, Project Manager<br />
bei Kunshan.<br />
Die exzellente Zusammenarbeit wird auch<br />
seitens Achenbach gelobt: „Das professionelle<br />
Projektmanagement von KunShan <strong>Alu</strong>minium<br />
in diesem ehrgeizigen Projekt hat eine<br />
nahezu reibungslose Abwicklung möglich gemacht:<br />
Die Baustelle war für <strong>de</strong>n Start <strong>de</strong>r Vor-<br />
Ort-Montage perfekt vorbereitet, die Zuverlässigkeit<br />
<strong>de</strong>s Kun<strong>de</strong>n während <strong>de</strong>r Montage<br />
und Inbetriebnahme hoch, und kleinere Engpässe,<br />
die es auf einer Baustelle nun einmal<br />
immer mal wie<strong>de</strong>r gibt, wur<strong>de</strong>n stets unbürokratisch<br />
und schnell gemeinsam behoben“, so<br />
beschreiben Jörg-Michael Hey als Chef <strong>de</strong>r<br />
Auftragsabwicklung und Daniela Posselt als<br />
Projektmanagerin die Zusammenarbeit.<br />
Montage- und Inbetriebnahme-Team unterstreichen<br />
ihrerseits die große Hilfsbereitschaft<br />
<strong>de</strong>r KunShan-Mitarbeiter: „Dies war eine angenehme<br />
Baustelle, die richtig Spaß gemacht<br />
hat.“ Und Wilhelm-Friedrich Sommer, gesamtverantwortlich<br />
für <strong>de</strong>n technischen Vertrieb,<br />
betont: „Mit diesem Projekt wur<strong>de</strong>n die<br />
guten Geschäftsbeziehungen zwischen Kun-<br />
Shan <strong>Alu</strong>minium und Achenbach Buschhütten<br />
ein weiteres Mal bestätigt. Wir freuen uns,<br />
mit KunShan <strong>Alu</strong>minium einen Premium-<br />
Folienproduzenten als Kun<strong>de</strong>n zu haben, <strong>de</strong>r<br />
sich mit technischen Ehrgeiz und Begeisterung<br />
für mo<strong>de</strong>rne Technologie für Achenbach als<br />
Anlagenlieferanten entschie<strong>de</strong>n hat. Wir wür<strong>de</strong>n<br />
uns sehr freuen, wenn wir ihm auch in<br />
Zukunft in Anlagenservice und Anlagenausbau<br />
zur Seite stehen dürfen.“<br />
n<br />
The Royal Mint: Siemens VAI implements optimal<br />
upgra<strong>de</strong> path for the legacy automatic gauge control<br />
M. Chatterton, Siemens VAI<br />
The roots of Siemens VAI as it stands today,<br />
as part of Siemens Plc’s Industry Sector, lead<br />
back to the Davy business who, during the<br />
1980s and 1990s installed many Automatic<br />
Gauge Control (<strong>AG</strong>C) / Automatic Flatness<br />
Control (AFC) systems on cold mills using<br />
their System 2, 21 and KS2100 platforms.<br />
With advances in technology, support for<br />
these platforms is no longer guaranteed due<br />
to equipment obsolescence. As such producers<br />
are reliant on in-house spares and know-how<br />
to maintain the systems, and are therefore<br />
susceptible to excessive downtime if a breakdown<br />
occurs in these systems.<br />
Stuart North, project manager at Siemens<br />
VAI, comments: “This was the situation facing<br />
the Royal Mint on their single stand cold<br />
reversing mill at Llantrisant, Wales. Davy Mc-<br />
Kee had installed a System 21 <strong>AG</strong>C on the mill<br />
in the mid-1990s and had continued support of<br />
the system through a service contract with Siemens.<br />
After a significant breakdown in 2011,<br />
it was evi<strong>de</strong>nt to both The Royal Mint and Siemens<br />
that the system had to be replaced.”<br />
According to Stuart, the objectives of the<br />
upgra<strong>de</strong> project were to<br />
• replace the existing System 21 automatic<br />
gauge system and main DC drives (mill,<br />
coiler, un-coiler) with a cost effective<br />
solution which would minimise downtime<br />
• i<strong>de</strong>ntify any other major components<br />
which should be replaced either due to<br />
obsolescence or to provi<strong>de</strong> either<br />
improved performance or an optimum<br />
solution<br />
• obtain at least the equivalent thickness<br />
tolerances as achieved with the existing<br />
System 21<br />
• <strong>de</strong>liver the equipment within nine<br />
months and install and start-up the mill<br />
within a 10 day shutdown.<br />
The new <strong>AG</strong>C system was based on the latest<br />
Siemens VAI Siroll <strong>Alu</strong> TCS which is based<br />
on the Siroll suite of software and system solutions.<br />
The hardware backbone is the high<br />
performance Simatic TDC system.<br />
The system inclu<strong>de</strong>s all the features typically<br />
nee<strong>de</strong>d for a cold mill application to optimise<br />
the rolling operation:<br />
• <strong>AG</strong>C for narrow strip thickness tolerances<br />
• Stand controls for closed loop control of<br />
the mill actuators<br />
• Intelligent pass schedule editor and storage<br />
© Siemens<br />
Siroll <strong>Alu</strong> TCS Cabinet<br />
Siroll <strong>Alu</strong> TCS – pass scheduling editor and storage<br />
32 ALUMINIUM · 11/2013